Jobs Near Me
  • Home
  • Search Jobs
  • Register CV
  • Post a Job
  • Employer Pricing
  • Contact Us
  • Sign in
  • Sign up
  • Home
  • Search Jobs
  • Register CV
  • Post a Job
  • Employer Pricing
  • Contact Us
Sorry, that job is no longer available. Here are some results that may be similar to the job you were looking for.

182 jobs found

Email me jobs like this
Refine Search
Current Search
construction manager data center construction
Amazon Data Services, Inc.
Sr. Schedule Controls Manager, AMER Construction Programs
Amazon Data Services, Inc. Herndon, Virginia
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we're the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain - and we're looking for talented people who want to help. You'll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You'll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you'll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion. The AMER Schedule Controls Manager is responsible for managing some of the most technical, cost-efficient, and fast-paced construction project schedules achievable. They are constantly challenged to drive continuous improvement, reduced timelines & identify spend reduction opportunities while delivering the highest quality, most technically efficient data centers in the world. Key job responsibilities Lead strategic schedule management for Amazon's innovative data center construction projects across the Americas. As a key member of our team, you'll provide expert guidance on complex project scheduling challenges while ensuring timely delivery of critical infrastructure. Key Responsibilities: • Lead and mentor a team of contract Schedulers Develop and analyze project schedules (L1-L5), identifying critical paths and optimization opportunities Facilitate Interactive Project Planning Meetings (IPPM) with internal/external stakeholders Conduct schedule risk assessments and what-if scenarios Review and validate contractor schedules and resource loading Prepare executive-level schedule status reports and dashboards Oversee Earned Value Management (EVM) implementation for schedule tracking Support schedule forensic analysis and improvement initiatives Technical Requirements: Expert knowledge of project scheduling methodologies and tools Ability to interpret multi-discipline construction documents Understanding of building codes (Life Safety, BOCA, NFPA, NEC, OSHA) Experience with progress measurement and performance tracking Travel Requirements: • Up to 25% travel across Americas (US, Canada, LATAM) • Site visits for pre-construction planning, systems reviews, and commissioning support About the team Why AWS Amazon Web Services (AWS) is the world's most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating - that's why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses. Diverse Experiences Amazon values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn't followed a traditional path, or includes alternative experiences, don't let it stop you from applying. Work/Life Balance We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there's nothing we can't achieve in the cloud. Inclusive Team Culture Here at AWS, it's in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon (gender diversity) conferences, inspire us to never stop embracing our uniqueness. Mentorship and Career Growth We're continuously raising our performance bar as we strive to become Earth's Best Employer. That's why you'll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional. BASIC QUALIFICATIONS - Bachelor's degree in Mechanical Engineering PREFERRED QUALIFICATIONS - Expert-level Primavera P6 skills all schedule management tooling and techniques Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status. Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit for more information. If the country/region you're applying in isn't listed, please contact your Recruiting Partner. The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at . USA, VA, Herndon - 139 000.00 USD annually
09/20/2026
Full time
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we're the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain - and we're looking for talented people who want to help. You'll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You'll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you'll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion. The AMER Schedule Controls Manager is responsible for managing some of the most technical, cost-efficient, and fast-paced construction project schedules achievable. They are constantly challenged to drive continuous improvement, reduced timelines & identify spend reduction opportunities while delivering the highest quality, most technically efficient data centers in the world. Key job responsibilities Lead strategic schedule management for Amazon's innovative data center construction projects across the Americas. As a key member of our team, you'll provide expert guidance on complex project scheduling challenges while ensuring timely delivery of critical infrastructure. Key Responsibilities: • Lead and mentor a team of contract Schedulers Develop and analyze project schedules (L1-L5), identifying critical paths and optimization opportunities Facilitate Interactive Project Planning Meetings (IPPM) with internal/external stakeholders Conduct schedule risk assessments and what-if scenarios Review and validate contractor schedules and resource loading Prepare executive-level schedule status reports and dashboards Oversee Earned Value Management (EVM) implementation for schedule tracking Support schedule forensic analysis and improvement initiatives Technical Requirements: Expert knowledge of project scheduling methodologies and tools Ability to interpret multi-discipline construction documents Understanding of building codes (Life Safety, BOCA, NFPA, NEC, OSHA) Experience with progress measurement and performance tracking Travel Requirements: • Up to 25% travel across Americas (US, Canada, LATAM) • Site visits for pre-construction planning, systems reviews, and commissioning support About the team Why AWS Amazon Web Services (AWS) is the world's most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating - that's why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses. Diverse Experiences Amazon values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn't followed a traditional path, or includes alternative experiences, don't let it stop you from applying. Work/Life Balance We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there's nothing we can't achieve in the cloud. Inclusive Team Culture Here at AWS, it's in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon (gender diversity) conferences, inspire us to never stop embracing our uniqueness. Mentorship and Career Growth We're continuously raising our performance bar as we strive to become Earth's Best Employer. That's why you'll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional. BASIC QUALIFICATIONS - Bachelor's degree in Mechanical Engineering PREFERRED QUALIFICATIONS - Expert-level Primavera P6 skills all schedule management tooling and techniques Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status. Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit for more information. If the country/region you're applying in isn't listed, please contact your Recruiting Partner. The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at . USA, VA, Herndon - 139 000.00 USD annually
Mechanical Construction - Assistant Project Manager/Project Engineer
Adams CG Frederick, Maryland
Finishing School with construction management, engineering, or related field? Construction, HVAC, or Plumbing background or interest. A WELL ESTABLISHED MECHANICAL CONTRACTOR in the Northern Maryland MARKET on a strong growth trajectory is seeking a Junior MECHANICAL Project Manager for large HVAC and/or Plumbing construction projects. Projects including Schools, Offices, Hospitals, Government/Military, Data Centers etc. STRONG LEADERSHIP AND PROBLEM-SOLVING SKILLS REQUIRED, TOP PAY and BENEFITS, GREAT Managem ent Team and Room to GROW in YOUR CAREER! Please send your Resume and/or Project List. All responses and inquiries will be held strictly CONFIDENTIAL!
09/20/2026
Finishing School with construction management, engineering, or related field? Construction, HVAC, or Plumbing background or interest. A WELL ESTABLISHED MECHANICAL CONTRACTOR in the Northern Maryland MARKET on a strong growth trajectory is seeking a Junior MECHANICAL Project Manager for large HVAC and/or Plumbing construction projects. Projects including Schools, Offices, Hospitals, Government/Military, Data Centers etc. STRONG LEADERSHIP AND PROBLEM-SOLVING SKILLS REQUIRED, TOP PAY and BENEFITS, GREAT Managem ent Team and Room to GROW in YOUR CAREER! Please send your Resume and/or Project List. All responses and inquiries will be held strictly CONFIDENTIAL!
Traveling Senior Project Manager
Enterprise Electrical Houston, Texas
Job Description Job Description EE Company and Team: Enterprise Electrical is a rapidly growing Design-Build Commercial Electrical Contractor headquartered in Houston, TX. We specialize in Design-Build projects and deliver exceptional work in heavy commercial, light industrial, and have recently expanded into data center projects. At Enterprise Electrical , we take pride in fostering a positive, collaborative work environment where you can look forward to coming to work every day. If you are a committed, self-driven professional with a passion for excellence, we want you on our team. Job Summary: We are seeking an experienced Senior Project Manager with proven Mission Critical / Data Center project experience to lead complex, high-value electrical projects from pre-construction through commissioning and close-out. This role is responsible for driving safety, schedule, quality, financial performance, and client satisfaction in fast-paced, high-reliability environments. Specific Responsibilities: •Focus on maintaining the Enterprise Electrical Safety Standards •Lead planning, scheduling, and execution of multiple commercial electrical •Manage project budgets, forecasts, and financial performance; ensure profitability targets are met. •Review drawings, specifications, and contracts to identify risks, opportunities, and project requirements. •Collaborate with field supervisors, general contractors, engineers, and clients to ensure alignment and successful •Manage procurement, submittals, RFIs, change orders, and project closeout. •Monitor job progress, ensure adherence to construction schedules, and adjust resources as needed. •Enforce safety standards and quality control measures in all project •Provide leadership, coaching, and mentorship to project engineers, coordinators, and Skills and Qualification: • 8+ years of experience in electrical project management within commercial or industrial construction. • Proven track record managing projects $5M+ in value. • Extensive knowledge of electrical systems, NEC codes, safety practices, and construction methodologies. • Bachelor's degree in construction management, Electrical Engineering, or related field preferred. • Proficient in project management software such as Rivet, Procore, Microsoft Project, Bluebeam, and Excel. • Strong leadership, problem-solving, and communication skills. • Ability to work in a fast-paced, deadline-driven environment's+ years of commercial electrical project management experience required. • Strong understanding of NEC, local building codes, and electrical construction methods. • Proven ability to manage multi-site or traveling construction operations. • Proficient in project management software (e.g., Revit, Procore, MS Project, Bluebeam, or similar). • Ability to read and interpret construction drawings, electrical schematics, and specifications. • Excellent leadership, negotiation, and communication skills. • Prior field experience as an electrician, foreman, or superintendent. • OSHA 30 certification and CPR/First Aid preferred. • Experience with design-build or fast-track commercial electrical projects. • Bilingual (English/Spanish) is a plus. Benefits: • Per diem and Travel allowance • Medical, Dental and Vision Insurance • 401K (begins at 30 days of employment) • Bonus opportunities • Paid Time Off • Paid Holidays • 401K (starts 90 days from start date) • WEX card for fuel • Continuing Education resources and opportunities Enterprise Electrical Core Values Committed to Excellence (Greatness) Plan it, Do it, Own it (Accountability) Learn it, Know it, Teach it (Mentorship) One Team, One Goal (Teamwork) Positive Attitude Required (Positivity) Safety First, Safety Always (Safety)
09/20/2026
Full time
Job Description Job Description EE Company and Team: Enterprise Electrical is a rapidly growing Design-Build Commercial Electrical Contractor headquartered in Houston, TX. We specialize in Design-Build projects and deliver exceptional work in heavy commercial, light industrial, and have recently expanded into data center projects. At Enterprise Electrical , we take pride in fostering a positive, collaborative work environment where you can look forward to coming to work every day. If you are a committed, self-driven professional with a passion for excellence, we want you on our team. Job Summary: We are seeking an experienced Senior Project Manager with proven Mission Critical / Data Center project experience to lead complex, high-value electrical projects from pre-construction through commissioning and close-out. This role is responsible for driving safety, schedule, quality, financial performance, and client satisfaction in fast-paced, high-reliability environments. Specific Responsibilities: •Focus on maintaining the Enterprise Electrical Safety Standards •Lead planning, scheduling, and execution of multiple commercial electrical •Manage project budgets, forecasts, and financial performance; ensure profitability targets are met. •Review drawings, specifications, and contracts to identify risks, opportunities, and project requirements. •Collaborate with field supervisors, general contractors, engineers, and clients to ensure alignment and successful •Manage procurement, submittals, RFIs, change orders, and project closeout. •Monitor job progress, ensure adherence to construction schedules, and adjust resources as needed. •Enforce safety standards and quality control measures in all project •Provide leadership, coaching, and mentorship to project engineers, coordinators, and Skills and Qualification: • 8+ years of experience in electrical project management within commercial or industrial construction. • Proven track record managing projects $5M+ in value. • Extensive knowledge of electrical systems, NEC codes, safety practices, and construction methodologies. • Bachelor's degree in construction management, Electrical Engineering, or related field preferred. • Proficient in project management software such as Rivet, Procore, Microsoft Project, Bluebeam, and Excel. • Strong leadership, problem-solving, and communication skills. • Ability to work in a fast-paced, deadline-driven environment's+ years of commercial electrical project management experience required. • Strong understanding of NEC, local building codes, and electrical construction methods. • Proven ability to manage multi-site or traveling construction operations. • Proficient in project management software (e.g., Revit, Procore, MS Project, Bluebeam, or similar). • Ability to read and interpret construction drawings, electrical schematics, and specifications. • Excellent leadership, negotiation, and communication skills. • Prior field experience as an electrician, foreman, or superintendent. • OSHA 30 certification and CPR/First Aid preferred. • Experience with design-build or fast-track commercial electrical projects. • Bilingual (English/Spanish) is a plus. Benefits: • Per diem and Travel allowance • Medical, Dental and Vision Insurance • 401K (begins at 30 days of employment) • Bonus opportunities • Paid Time Off • Paid Holidays • 401K (starts 90 days from start date) • WEX card for fuel • Continuing Education resources and opportunities Enterprise Electrical Core Values Committed to Excellence (Greatness) Plan it, Do it, Own it (Accountability) Learn it, Know it, Teach it (Mentorship) One Team, One Goal (Teamwork) Positive Attitude Required (Positivity) Safety First, Safety Always (Safety)
Amazon Data Services, Inc.
Controls Engineer, Deployment, Data Center Capacity Delivery
Amazon Data Services, Inc. Herndon, Virginia
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we're the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain - and we're looking for talented people who want to help. You'll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You'll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you'll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion. As part of the global controls team, you will work with highly motivated experts and innovators in the data center industry. You will be responsible for troubleshooting, project management, and maintaining the building management system (BMS) and electrical power monitoring system (EPMS). Using Amazon leadership principles, you will develop new processes and standards while innovating in the controls space. AWS Data centers have multiple components such as generators, uninterruptible power sources, diesel generators, electrical switchgear, power distribution units, variable frequency drives, automatic/static transfer switches, chillers air-cooled and water-cooled , pumps, cooling towers, heat exchangers, CRAHs, air economizers, etc. All these components have local control systems that interact with each other via open and/or proprietary communications protocols. The BMS is the primary method of control of all mechanical systems within a data center. The EPMS is the primary method of monitoring all electrical systems within a data center. Key job responsibilities • Train and assist internal customers and stakeholders with the creation, design, configuration, validation, installation, commissioning and operation of BMS and EPMS systems. • Provide technical assistance and support to operations during life cycle of the data center. • Review results and action items from the quarterly maintenances for BMS and EPMS and take actions to get them resolved. • Develop BMS & EPMS projects scope of work, schedule, budget, and level of efforts (LOE) to projects requested by customers and stakeholders. • Manage scope, schedule, finance and execution of BMS and EPMS improvement projects in AWS data centers. • Assist in procurement related activities including request for quotation/proposals, responding to request for information, review of vendors proposal and issuance of purchase orders. • Participate in AWS global on-call schedule to provide immediate BMS and EPMS technical support to in-service data centers. • Attend project related meetings, coordinate with project leaders and regularly report status to Controls and stakeholder's management. • Support Controls projects related commissioning activities in the data centers. • Review, implement, troubleshoot and iterate on the controls sequence of operation (SOO) and provide necessary feedback to the design team. • Develop and modify controls logic programming and graphical user interfaces. • Manage multiple stakeholder deliverables, requirements and navigate challenging situations. • Financially manage BMS and EPMS service contracts. • Frequently visit (locally) assigned in-operation data centers to troubleshoot, meet customers, supervise vendor's work to ensure compliance with the scope, design, SOO and applicable local codes. About the team Amazon Web Services (AWS) is the world's most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating - that's why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses. Amazon values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn't followed a traditional path, or includes alternative experiences, don't let it stop you from applying. We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there's nothing we can't achieve in the cloud. Here at AWS, it's in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon (gender diversity) conferences, inspire us to never stop embracing our uniqueness. We're continuously raising our performance bar as we strive to become Earth's Best Employer. That's why you'll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional. BASIC QUALIFICATIONS - 5+ years of industrial controls and automation experience - 4+ years of general contractor and vendor management work (request for proposals, bidding, change orders, quality control, RFI/submittal tracking) associated with construction and project execution experience - Bachelor's degree in Mechanical Engineering, Electrical Engineering, or an equivalent engineering science plus 5+ years of relevant controls experience, OR 10+ years of relevant controls experience in lieu of a degree. PREFERRED QUALIFICATIONS - Master's degree in mechanical engineering, electrical engineering, material science, physics or equivalent, or MS degree - Experience designing, configuring, programming, installing, troubleshooting or servicing HVAC Controls or Electrical SCADA systems application specific controllers, software and networks. - Experiencing using common industrial communication protocols (MQTT, BACnet and/or MODBUS). - Demonstrated understanding of engineering documentation, electrical and mechanical diagrams, and standard operating procedures. - Ability to manage multiple stakeholder deliverables, requirements, and navigate difficult situations. - Experience designing data centers or critical MEP infrastructure - Registered as a Professional Engineer (PE), or certified Project Management Professional (PMP). Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status. Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit for more information. If the country/region you're applying in isn't listed, please contact your Recruiting Partner. The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at . USA, VA, Herndon - 111 100.00 USD annually
09/20/2026
Full time
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we're the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain - and we're looking for talented people who want to help. You'll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You'll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you'll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion. As part of the global controls team, you will work with highly motivated experts and innovators in the data center industry. You will be responsible for troubleshooting, project management, and maintaining the building management system (BMS) and electrical power monitoring system (EPMS). Using Amazon leadership principles, you will develop new processes and standards while innovating in the controls space. AWS Data centers have multiple components such as generators, uninterruptible power sources, diesel generators, electrical switchgear, power distribution units, variable frequency drives, automatic/static transfer switches, chillers air-cooled and water-cooled , pumps, cooling towers, heat exchangers, CRAHs, air economizers, etc. All these components have local control systems that interact with each other via open and/or proprietary communications protocols. The BMS is the primary method of control of all mechanical systems within a data center. The EPMS is the primary method of monitoring all electrical systems within a data center. Key job responsibilities • Train and assist internal customers and stakeholders with the creation, design, configuration, validation, installation, commissioning and operation of BMS and EPMS systems. • Provide technical assistance and support to operations during life cycle of the data center. • Review results and action items from the quarterly maintenances for BMS and EPMS and take actions to get them resolved. • Develop BMS & EPMS projects scope of work, schedule, budget, and level of efforts (LOE) to projects requested by customers and stakeholders. • Manage scope, schedule, finance and execution of BMS and EPMS improvement projects in AWS data centers. • Assist in procurement related activities including request for quotation/proposals, responding to request for information, review of vendors proposal and issuance of purchase orders. • Participate in AWS global on-call schedule to provide immediate BMS and EPMS technical support to in-service data centers. • Attend project related meetings, coordinate with project leaders and regularly report status to Controls and stakeholder's management. • Support Controls projects related commissioning activities in the data centers. • Review, implement, troubleshoot and iterate on the controls sequence of operation (SOO) and provide necessary feedback to the design team. • Develop and modify controls logic programming and graphical user interfaces. • Manage multiple stakeholder deliverables, requirements and navigate challenging situations. • Financially manage BMS and EPMS service contracts. • Frequently visit (locally) assigned in-operation data centers to troubleshoot, meet customers, supervise vendor's work to ensure compliance with the scope, design, SOO and applicable local codes. About the team Amazon Web Services (AWS) is the world's most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating - that's why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses. Amazon values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn't followed a traditional path, or includes alternative experiences, don't let it stop you from applying. We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there's nothing we can't achieve in the cloud. Here at AWS, it's in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon (gender diversity) conferences, inspire us to never stop embracing our uniqueness. We're continuously raising our performance bar as we strive to become Earth's Best Employer. That's why you'll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional. BASIC QUALIFICATIONS - 5+ years of industrial controls and automation experience - 4+ years of general contractor and vendor management work (request for proposals, bidding, change orders, quality control, RFI/submittal tracking) associated with construction and project execution experience - Bachelor's degree in Mechanical Engineering, Electrical Engineering, or an equivalent engineering science plus 5+ years of relevant controls experience, OR 10+ years of relevant controls experience in lieu of a degree. PREFERRED QUALIFICATIONS - Master's degree in mechanical engineering, electrical engineering, material science, physics or equivalent, or MS degree - Experience designing, configuring, programming, installing, troubleshooting or servicing HVAC Controls or Electrical SCADA systems application specific controllers, software and networks. - Experiencing using common industrial communication protocols (MQTT, BACnet and/or MODBUS). - Demonstrated understanding of engineering documentation, electrical and mechanical diagrams, and standard operating procedures. - Ability to manage multiple stakeholder deliverables, requirements, and navigate difficult situations. - Experience designing data centers or critical MEP infrastructure - Registered as a Professional Engineer (PE), or certified Project Management Professional (PMP). Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status. Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit for more information. If the country/region you're applying in isn't listed, please contact your Recruiting Partner. The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at . USA, VA, Herndon - 111 100.00 USD annually
Amazon Data Services, Inc.
Quality Control Engineer, Integrated Project Quality (IPQ)
Amazon Data Services, Inc. Berwick, Pennsylvania
The Quality Control Engineer (QCE) plays an essential role in AWS Data Center Capacity Delivery's (DCCD) Integrated Project Quality (IPQ) program. This position is responsible for overseeing and executing quality assurance and control (QAQC) processes throughout the lifecycle of data center construction projects, ensuring that all work meets AWS's high standards for quality, safety, and performance. AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we're the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain - and we're looking for talented people who want to help. You'll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You'll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you'll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion. Key job responsibilities 1. Lead the implementation of QAQC processes throughout data center construction projects, from pre-design to turnover phases and beyond. 2. Review design documents and provide feedback on constructability, maintainability, and quality assurance measures. 3. Develop and maintain quality control plans, factory/field inspection checklists, and relevant documentation. 4. Conduct onsite QAQC inspections for installation activities, ensuring compliance with AWS standards and specifications. 5. Coordinate with third-party Quality Control Agents/Vendors (QCA) to ensure comprehensive QAQC. 6. Facilitate regular QC meetings with stakeholders to review and address quality-related issues. 7. Monitor and report on quality metrics and Key Performance Indicators (KPIs) throughout the project lifecycle. 8. Identify, document, and track quality defects or non-conformances, ensuring timely resolution. 9. Compile and deliver comprehensive quality control turnover packages for each project phase. 10. Conduct final quality reviews and walkthroughs with key stakeholders prior to project handover. 11. Facilitate knowledge transfer to end customers on QAQC processes and lessons learned. 12. Contribute to continuous improvement initiatives by analyzing quality data and proposing process enhancements. 13. Collaborate with cross-functional teams including Construction Management, Commissioning, and Data Center Engineering Operations to ensure seamless project execution. 14. Stay current with industry best practices and AWS-specific quality standards, incorporating them into quality control processes. 15. Willingness to travel up to 75% of the time to various OSA and project sites across North and South America About the team Amazon Web Services (AWS) is the world's most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating - that's why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses. Amazon values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn't followed a traditional path, or includes alternative experiences, don't let it stop you from applying. We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there's nothing we can't achieve in the cloud. Here at AWS, it's in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon conferences, inspire us to never stop embracing our uniqueness. We're continuously raising our performance bar as we strive to become Earth's Best Employer. That's why you'll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional. BASIC QUALIFICATIONS - Knowledge of Microsoft Office Suite (Excel, Word, SharePoint, and PowerPoint) - Bachelor's degree in Engineering (Mechanical, Electrical, or related field) or equivalent experience. - 5+ years of experience in quality control, construction management, or related field, preferably in data center or critical infrastructure projects. - Strong understanding of construction processes, mechanical and electrical systems, and quality control methodologies. - Knowledge of industry standards and best practices related to construction quality control. - Experience that includes strong analytical skills, attention to detail, and effective communication abilities. Experience building strategic relationships with stakeholders, including communicating and collaborating across teams and functions PREFERRED QUALIFICATIONS - Experience in a data center or other critical environment - Knowledge of AWS or the cloud computing industry - Project Management Professional (PMP) or equivalent certification Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status. Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit for more information. If the country/region you're applying in isn't listed, please contact your Recruiting Partner. The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at . USA, PA, BERWICK - 116 000.00 USD annually
09/20/2026
Full time
The Quality Control Engineer (QCE) plays an essential role in AWS Data Center Capacity Delivery's (DCCD) Integrated Project Quality (IPQ) program. This position is responsible for overseeing and executing quality assurance and control (QAQC) processes throughout the lifecycle of data center construction projects, ensuring that all work meets AWS's high standards for quality, safety, and performance. AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we're the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain - and we're looking for talented people who want to help. You'll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You'll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you'll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion. Key job responsibilities 1. Lead the implementation of QAQC processes throughout data center construction projects, from pre-design to turnover phases and beyond. 2. Review design documents and provide feedback on constructability, maintainability, and quality assurance measures. 3. Develop and maintain quality control plans, factory/field inspection checklists, and relevant documentation. 4. Conduct onsite QAQC inspections for installation activities, ensuring compliance with AWS standards and specifications. 5. Coordinate with third-party Quality Control Agents/Vendors (QCA) to ensure comprehensive QAQC. 6. Facilitate regular QC meetings with stakeholders to review and address quality-related issues. 7. Monitor and report on quality metrics and Key Performance Indicators (KPIs) throughout the project lifecycle. 8. Identify, document, and track quality defects or non-conformances, ensuring timely resolution. 9. Compile and deliver comprehensive quality control turnover packages for each project phase. 10. Conduct final quality reviews and walkthroughs with key stakeholders prior to project handover. 11. Facilitate knowledge transfer to end customers on QAQC processes and lessons learned. 12. Contribute to continuous improvement initiatives by analyzing quality data and proposing process enhancements. 13. Collaborate with cross-functional teams including Construction Management, Commissioning, and Data Center Engineering Operations to ensure seamless project execution. 14. Stay current with industry best practices and AWS-specific quality standards, incorporating them into quality control processes. 15. Willingness to travel up to 75% of the time to various OSA and project sites across North and South America About the team Amazon Web Services (AWS) is the world's most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating - that's why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses. Amazon values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn't followed a traditional path, or includes alternative experiences, don't let it stop you from applying. We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there's nothing we can't achieve in the cloud. Here at AWS, it's in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon conferences, inspire us to never stop embracing our uniqueness. We're continuously raising our performance bar as we strive to become Earth's Best Employer. That's why you'll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional. BASIC QUALIFICATIONS - Knowledge of Microsoft Office Suite (Excel, Word, SharePoint, and PowerPoint) - Bachelor's degree in Engineering (Mechanical, Electrical, or related field) or equivalent experience. - 5+ years of experience in quality control, construction management, or related field, preferably in data center or critical infrastructure projects. - Strong understanding of construction processes, mechanical and electrical systems, and quality control methodologies. - Knowledge of industry standards and best practices related to construction quality control. - Experience that includes strong analytical skills, attention to detail, and effective communication abilities. Experience building strategic relationships with stakeholders, including communicating and collaborating across teams and functions PREFERRED QUALIFICATIONS - Experience in a data center or other critical environment - Knowledge of AWS or the cloud computing industry - Project Management Professional (PMP) or equivalent certification Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status. Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit for more information. If the country/region you're applying in isn't listed, please contact your Recruiting Partner. The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at . USA, PA, BERWICK - 116 000.00 USD annually
BMS Estimator (Remote)
Mantis Innovation Schaumburg, Illinois
Job Description Job Description About Mantis We help organizations improve how their buildings perform by bringing together energy, facility operations, and sustainability into one connected approach. At Mantis, our teams work across the full lifecycle of a facility-from planning and design to field execution and long-term asset management-across commercial and industrial portfolios, data centers, and complex mechanical systems. Our work spans four core areas: Building Controls, Energy Efficiency, Energy Advisory, and Facility Management-covering HVAC/mechanical optimization, BMS/BAS and EPMS controls, lighting system upgrades, energy brokerage, roofing and building envelope assessments, construction management, and more. Whether you're in sales, engineering, construction/project management, field operations, corporate, or technology, you'll play a role in delivering these solutions and helping clients improve facility performance. Position Summary The BMS Estimator is responsible for developing accurate cost estimates and proposals for Building Management Systems (BMS), Building Automation Systems (BAS), HVAC controls, energy management, EPMS integration, and related facility automation projects. The successful candidate combines controls expertise, construction knowledge, operational understanding, and commercial judgment to create competitive and profitable proposals for commercial, industrial, healthcare, pharmaceutical, higher education, and mission-critical data center projects. Key Responsibilities Review construction drawings, specifications, submittals, and bid packages to determine actual BMS/BAS project scope. Responsible for clarifying the SOW by issuing Requests For Information (RFIs) during the bid process Develop equipment counts, point counts, material takeoffs, labor estimates, software requirements, and pricing summaries. Prepare customer-facing proposals, scope documents, exclusions, assumptions, qualifications, and bid summaries. Identify constructability concerns, design conflicts, coordination issues, scope gaps, and commercial risks before contract award. Review revised drawing packages and evaluate impacts to labor, materials, schedule, commissioning requirements, and execution strategy. Solicit, evaluate, and level vendor and subcontractor quotations. Support project handoff activities, change order pricing, and scope evaluations during project execution. Evaluate integration requirements involving BAS, BMS, EPMS, SCADA, DCIM, lighting controls, utility monitoring systems, and third-party integrations. Participate in customer meetings, site walks, pre-bid conferences, and internal estimate reviews. Required Qualifications 5+ years of experience in BMS/BAS, Controls Engineering, Controls Project Management, Controls Field Service, Solutions Engineering, System Integration, or related environments. Ability to read and interpret mechanical, electrical, controls, and construction drawings and specifications. Strong knowledge of HVAC controls, DDC controls, commissioning practices, and operational building systems. Experience developing project scope from construction documents. Strong analytical, organizational, communication, and commercial skills. Preferred Qualifications Experience as a Controls Technician, Controls Engineer, Controls Project Manager, Systems Engineer, Solutions Engineer, or Operations Manager. Experience in mission-critical environments including data centers, healthcare, laboratories, utilities, industrial facilities, central plants, and large commercial facilities. Experience with Niagara, Automated Logic, Schneider Electric EcoStruxure, Siemens Desigo, Johnson Controls Metasys, Honeywell EBI, Distech, or similar platforms. Knowledge of BACnet, Modbus, LonWorks, SNMP, and integrated building systems. Experience commissioning, integrating, programming, troubleshooting, or supporting controls systems. Technical Skills Building Management Systems (BMS) Building Automation Systems (BAS) EPMS, SCADA, and DCIM Systems HVAC and DDC Controls Cost Estimating and Budgeting Bluebeam AutoCAD Revit (Preferred) Microsoft Excel ERP and Project Management Software Typical Deliverables Detailed Cost Estimates Bid Proposals and Quotations Scope of Work Documents Material Takeoffs Labor Forecasts Project Budgets Change Order Pricing Value Engineering Recommendations Working Conditions Work is performed in office, remote, and active project environments with periodic travel based on project and customer needs. Note: Employees are held accountable for all duties of this job. This job description is not intended to be an exhaustive list of all duties, responsibilities, or qualifications associated with the position. What else can we offer you? We offer a fantastic lineup of benefits, including Medical, Dental, Vision, FSA, HSA, 401k Matching, Paid Vacation, Paid Sick, Paid Holidays, Paid Parental Leave, Paid Short Term & Long Term Disability, Tuition Reimbursement, and a flexible hybrid work schedule (for office-based employees). Working at Mantis also brings tremendous professional development opportunities that allow you to make a real impact on both the company and your career! Not sure you meet every single requirement? Studies show that women and individuals from underrepresented groups often hesitate to apply unless they check every box. At Mantis, we're committed to building an inclusive and equitable team-so if this role excites you, we'd love to hear from you, even if your experience doesn't match every single qualification. Mantis Innovation is an equal opportunity employer and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, disability status, protected veteran status, or any other characteristic protected by law. We may use artificial intelligence (AI) tools to support parts of the hiring process, such as reviewing applications, analyzing resumes, or assessing responses and identifying potential inconsistencies or verification signals in application materials based on available information. These tools assist our recruitment team but do not replace human judgment. Final hiring decisions are ultimately made by humans. If you would like more information about how your data is processed, please contact us.
09/20/2026
Full time
Job Description Job Description About Mantis We help organizations improve how their buildings perform by bringing together energy, facility operations, and sustainability into one connected approach. At Mantis, our teams work across the full lifecycle of a facility-from planning and design to field execution and long-term asset management-across commercial and industrial portfolios, data centers, and complex mechanical systems. Our work spans four core areas: Building Controls, Energy Efficiency, Energy Advisory, and Facility Management-covering HVAC/mechanical optimization, BMS/BAS and EPMS controls, lighting system upgrades, energy brokerage, roofing and building envelope assessments, construction management, and more. Whether you're in sales, engineering, construction/project management, field operations, corporate, or technology, you'll play a role in delivering these solutions and helping clients improve facility performance. Position Summary The BMS Estimator is responsible for developing accurate cost estimates and proposals for Building Management Systems (BMS), Building Automation Systems (BAS), HVAC controls, energy management, EPMS integration, and related facility automation projects. The successful candidate combines controls expertise, construction knowledge, operational understanding, and commercial judgment to create competitive and profitable proposals for commercial, industrial, healthcare, pharmaceutical, higher education, and mission-critical data center projects. Key Responsibilities Review construction drawings, specifications, submittals, and bid packages to determine actual BMS/BAS project scope. Responsible for clarifying the SOW by issuing Requests For Information (RFIs) during the bid process Develop equipment counts, point counts, material takeoffs, labor estimates, software requirements, and pricing summaries. Prepare customer-facing proposals, scope documents, exclusions, assumptions, qualifications, and bid summaries. Identify constructability concerns, design conflicts, coordination issues, scope gaps, and commercial risks before contract award. Review revised drawing packages and evaluate impacts to labor, materials, schedule, commissioning requirements, and execution strategy. Solicit, evaluate, and level vendor and subcontractor quotations. Support project handoff activities, change order pricing, and scope evaluations during project execution. Evaluate integration requirements involving BAS, BMS, EPMS, SCADA, DCIM, lighting controls, utility monitoring systems, and third-party integrations. Participate in customer meetings, site walks, pre-bid conferences, and internal estimate reviews. Required Qualifications 5+ years of experience in BMS/BAS, Controls Engineering, Controls Project Management, Controls Field Service, Solutions Engineering, System Integration, or related environments. Ability to read and interpret mechanical, electrical, controls, and construction drawings and specifications. Strong knowledge of HVAC controls, DDC controls, commissioning practices, and operational building systems. Experience developing project scope from construction documents. Strong analytical, organizational, communication, and commercial skills. Preferred Qualifications Experience as a Controls Technician, Controls Engineer, Controls Project Manager, Systems Engineer, Solutions Engineer, or Operations Manager. Experience in mission-critical environments including data centers, healthcare, laboratories, utilities, industrial facilities, central plants, and large commercial facilities. Experience with Niagara, Automated Logic, Schneider Electric EcoStruxure, Siemens Desigo, Johnson Controls Metasys, Honeywell EBI, Distech, or similar platforms. Knowledge of BACnet, Modbus, LonWorks, SNMP, and integrated building systems. Experience commissioning, integrating, programming, troubleshooting, or supporting controls systems. Technical Skills Building Management Systems (BMS) Building Automation Systems (BAS) EPMS, SCADA, and DCIM Systems HVAC and DDC Controls Cost Estimating and Budgeting Bluebeam AutoCAD Revit (Preferred) Microsoft Excel ERP and Project Management Software Typical Deliverables Detailed Cost Estimates Bid Proposals and Quotations Scope of Work Documents Material Takeoffs Labor Forecasts Project Budgets Change Order Pricing Value Engineering Recommendations Working Conditions Work is performed in office, remote, and active project environments with periodic travel based on project and customer needs. Note: Employees are held accountable for all duties of this job. This job description is not intended to be an exhaustive list of all duties, responsibilities, or qualifications associated with the position. What else can we offer you? We offer a fantastic lineup of benefits, including Medical, Dental, Vision, FSA, HSA, 401k Matching, Paid Vacation, Paid Sick, Paid Holidays, Paid Parental Leave, Paid Short Term & Long Term Disability, Tuition Reimbursement, and a flexible hybrid work schedule (for office-based employees). Working at Mantis also brings tremendous professional development opportunities that allow you to make a real impact on both the company and your career! Not sure you meet every single requirement? Studies show that women and individuals from underrepresented groups often hesitate to apply unless they check every box. At Mantis, we're committed to building an inclusive and equitable team-so if this role excites you, we'd love to hear from you, even if your experience doesn't match every single qualification. Mantis Innovation is an equal opportunity employer and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, disability status, protected veteran status, or any other characteristic protected by law. We may use artificial intelligence (AI) tools to support parts of the hiring process, such as reviewing applications, analyzing resumes, or assessing responses and identifying potential inconsistencies or verification signals in application materials based on available information. These tools assist our recruitment team but do not replace human judgment. Final hiring decisions are ultimately made by humans. If you would like more information about how your data is processed, please contact us.
Controls Project Manager - Data Center Construction
Pkaza Chesterton, Indiana
Job Description Job Description Controls Automation PM - Data Center - Chesterton, IN This opportunity is with an established General Contractor that specializes in converting existing Buildings and Structures into complex buildings / industrial complexes and is looking to expand its foothold even further into the Critical Facilities Market. Our client is taking their expertise and focus and applying it towards brownfield data center projects - which is the process for converting an existing building to a data center for the Hyperscale, Colo or Enterprise Marketplace. This company will provide a complete life cycle of solutions that will be custom-fit to the requirements of their client's mission-critical facility. This opportunity provides a career-growth minded role with exciting projects with leading-edge technology and innovation as well as competitive salaries and benefits. We are seeking a Controls Project Manager to lead and act as the point of contact on controls / automation-focused construction projects for hyperscale, colo and enterprise data centers. The ideal candidate will have experience integrating BMS / BAS / EPMS with HVAC / Mechanical / Electrical retrofits, overseeing automation and controls project teams, and interfacing with electrical and mechanical trades from design / build through commissioning and integration. This role requires strong leadership, stakeholder management, P&L, and execution of complex construction projects in live mission-critical environments. Responsibilities: Lead multi-site, hyperscale data center automation programs ranging from 20 MW to 200+ MW Oversee all phases of construction execution, from design-assist through integrated systems testing (IST) and owner turnover Manage field teams and subcontractors on BMS, EPMS, PLC / SCADA, and automation scopes Manage BAS / Controls with electrical power monitoring (EPMS), distributed control systems (DCS), fire-life-safety, and DCIM platforms Coordinate site logistics, factory witness testing, procurement, installation, systems / equipment integration, commissioning / IST and startup activities Develop detailed build sequences, integrate prefabrication and modular deployment strategies to meet speed-to-market goals Drive program financials including P&L ownership, value tracking, forecasts, change orders, contingency planning, etc. Chair weekly meetings with owners, general contractors, trades, and commissioning agents to align milestones and resolve issues Respond to RFPs / RFIs / RFQs and manage any change orders and negotiate adjustments Maintain safety, quality, and reliability across all scopes; ensure compliance with project procedures and regulatory requirements Develop and submit MOPs, SOPs, EOPs, and project documentation Utilize Procore, Primavera P6, MS Project, BIM360, and cost management platforms for reporting and tracking Contribute to innovation by integrating AI tools, BIM, and data analytics for continuous process improvement Mentor assistant PMs and project engineers; lead standardization efforts across the organization Qualifications: 5+ years of experience delivering large-scale mission-critical controls or automation project management Bachelor's degree in Engineering, Construction Management, or related field OR equivalent military/industry experience Experience with projects with 25-75 MW data center builds a plus Proven track record managing $2MM-$200MM+ data center construction projects from design through commissioning (level 4 / level 5 ) Deep knowledge of Building Automation Systems (BMS / BAS), EPMS, and industrial controls platforms like: Siemens, Rockwell, Schneider, Siemens, Ignition, Niagara, etc. Familiarity with integrated systems testing (IST), NFPA 70E, Uptime Institute Tier III/IV standards, and owner design guides Experience managing projects in live mission-critical environments, including retrofits and system integrations MOP and SOP development, and turnover documentation (GxP or mission-critical equivalent) Strong understanding of MEP, SCADA, DCIM, and control system sequencing and functionality Experience with protocols including (BACnet, Modbus, OPC-UA, Fieldbus, Profibus) PMP certification or other relevant credentials a plus Solid client-facing and communication skills; ability to interface with internal and external stakeholders Highly organized with strong administrative and documentation capabilities Proficient in MS Office Suite, Primavera P6, Procore, BIM 360, Bluebeam, and project scheduling tools Willingness to travel up to 20-50% to project sites as needed Previous experience in the Military / Military veterans in all branches that have experience with Electrical / Mechanical is a huge plus (Navy Nukes - EMN, ETN, MMNs, Seabees; Army - Power Generation; Air Force - Power Production; Generator Techs; Maritime; Coast Guard; etc.) Submittal Instructions: Please apply directly by clicking the link below, alternatively you can forward your resume directly to: After applying, if you have further questions, you may call and ask for Iggy. You can also submit via our career portal and take a look at other Critical Facility openings we are working on at, If this job is not for you, feel free to forward this along. WE PAY FOR REFERRALS Company offers competitive salaries and benefits package including medical insurance, a 401(k) plan EOE/AA Employer M/F/D/V Pkaza LLC is a third-party employment firm. All fees assessed by Pkaza LLC will be paid by our employer that we represent and not by the candidate
09/20/2026
Full time
Job Description Job Description Controls Automation PM - Data Center - Chesterton, IN This opportunity is with an established General Contractor that specializes in converting existing Buildings and Structures into complex buildings / industrial complexes and is looking to expand its foothold even further into the Critical Facilities Market. Our client is taking their expertise and focus and applying it towards brownfield data center projects - which is the process for converting an existing building to a data center for the Hyperscale, Colo or Enterprise Marketplace. This company will provide a complete life cycle of solutions that will be custom-fit to the requirements of their client's mission-critical facility. This opportunity provides a career-growth minded role with exciting projects with leading-edge technology and innovation as well as competitive salaries and benefits. We are seeking a Controls Project Manager to lead and act as the point of contact on controls / automation-focused construction projects for hyperscale, colo and enterprise data centers. The ideal candidate will have experience integrating BMS / BAS / EPMS with HVAC / Mechanical / Electrical retrofits, overseeing automation and controls project teams, and interfacing with electrical and mechanical trades from design / build through commissioning and integration. This role requires strong leadership, stakeholder management, P&L, and execution of complex construction projects in live mission-critical environments. Responsibilities: Lead multi-site, hyperscale data center automation programs ranging from 20 MW to 200+ MW Oversee all phases of construction execution, from design-assist through integrated systems testing (IST) and owner turnover Manage field teams and subcontractors on BMS, EPMS, PLC / SCADA, and automation scopes Manage BAS / Controls with electrical power monitoring (EPMS), distributed control systems (DCS), fire-life-safety, and DCIM platforms Coordinate site logistics, factory witness testing, procurement, installation, systems / equipment integration, commissioning / IST and startup activities Develop detailed build sequences, integrate prefabrication and modular deployment strategies to meet speed-to-market goals Drive program financials including P&L ownership, value tracking, forecasts, change orders, contingency planning, etc. Chair weekly meetings with owners, general contractors, trades, and commissioning agents to align milestones and resolve issues Respond to RFPs / RFIs / RFQs and manage any change orders and negotiate adjustments Maintain safety, quality, and reliability across all scopes; ensure compliance with project procedures and regulatory requirements Develop and submit MOPs, SOPs, EOPs, and project documentation Utilize Procore, Primavera P6, MS Project, BIM360, and cost management platforms for reporting and tracking Contribute to innovation by integrating AI tools, BIM, and data analytics for continuous process improvement Mentor assistant PMs and project engineers; lead standardization efforts across the organization Qualifications: 5+ years of experience delivering large-scale mission-critical controls or automation project management Bachelor's degree in Engineering, Construction Management, or related field OR equivalent military/industry experience Experience with projects with 25-75 MW data center builds a plus Proven track record managing $2MM-$200MM+ data center construction projects from design through commissioning (level 4 / level 5 ) Deep knowledge of Building Automation Systems (BMS / BAS), EPMS, and industrial controls platforms like: Siemens, Rockwell, Schneider, Siemens, Ignition, Niagara, etc. Familiarity with integrated systems testing (IST), NFPA 70E, Uptime Institute Tier III/IV standards, and owner design guides Experience managing projects in live mission-critical environments, including retrofits and system integrations MOP and SOP development, and turnover documentation (GxP or mission-critical equivalent) Strong understanding of MEP, SCADA, DCIM, and control system sequencing and functionality Experience with protocols including (BACnet, Modbus, OPC-UA, Fieldbus, Profibus) PMP certification or other relevant credentials a plus Solid client-facing and communication skills; ability to interface with internal and external stakeholders Highly organized with strong administrative and documentation capabilities Proficient in MS Office Suite, Primavera P6, Procore, BIM 360, Bluebeam, and project scheduling tools Willingness to travel up to 20-50% to project sites as needed Previous experience in the Military / Military veterans in all branches that have experience with Electrical / Mechanical is a huge plus (Navy Nukes - EMN, ETN, MMNs, Seabees; Army - Power Generation; Air Force - Power Production; Generator Techs; Maritime; Coast Guard; etc.) Submittal Instructions: Please apply directly by clicking the link below, alternatively you can forward your resume directly to: After applying, if you have further questions, you may call and ask for Iggy. You can also submit via our career portal and take a look at other Critical Facility openings we are working on at, If this job is not for you, feel free to forward this along. WE PAY FOR REFERRALS Company offers competitive salaries and benefits package including medical insurance, a 401(k) plan EOE/AA Employer M/F/D/V Pkaza LLC is a third-party employment firm. All fees assessed by Pkaza LLC will be paid by our employer that we represent and not by the candidate
Amazon Web Services, Inc.
Sr. Construction Manager, Data Center Construction
Amazon Web Services, Inc. Dallas, Texas
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we're the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain - and we're looking for talented people who want to help. You'll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You'll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you'll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion. As our Data Center Construction Manager (CM) , you will be a part of a diverse, upbeat, and creative team tasked with solving fascinating problems constructing Amazon Data Centers. Our data centers are industry-leading examples of energy efficient and cost-effective designs. Key job responsibilities • Own project scope, quality, schedule, and budget for construction of new builds or general capital projects. • Own construction project management and oversight of construction related activities. • Work alongside partner teams such as Operations, Networking, Controls, Security, and Commissioning to build Data Centers that directly support our Customers. • Be a leader in your specific discipline (construction management, building services, architectural, electrical or mechanical engineering). • Represent Amazon's owner's representative on construction sites daily, as, interacting with construction trades. • Be Amazon's construction representative on multiple data centers building and capital improvement construction project sites from construction start through hand-off to operations. • Direct interface with construction general contractors during the construction bidding, award, execution, punch-list, and closeout phases. • Create construction project scope and request for proposals. • Conduct negotiations with general contractors and evaluate bids and proposals with detail and accuracy. • Manage and drive cost, schedule, and quality while managing construction contractors and vendors. • Perform construction project management activities, including management of documents, submittals, RFIs, change orders, invoices, quality, scope, and schedule. • Drive construction teams to troubleshoot and perform root-cause failure analysis on equipment failures. • Support commissioning and integrated system testing and oversight. • Support operations of installed facilities, including review of procedures, best practices, and maintenance initiatives. • Support capital request creation. • Analyze and report construction progress and financials. • Record and report key construction metrics to team members and management. • Contribute to construction initiatives aimed at improving construction efficiency and increasing data center resiliency. • Provide constructability reviews for electrical and mechanical designs for new or optimization of existing data centers. About the team Diverse Experiences Amazon values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn't followed a traditional path, or includes alternative experiences, don't let it stop you from applying. Why AWS Amazon Web Services (AWS) is the world's most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating - that's why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses. Work/Life Balance We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there's nothing we can't achieve in the cloud. Inclusive Team Culture Here at AWS, it's in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon (gender diversity) conferences, inspire us to never stop embracing our uniqueness. Mentorship and Career Growth We're continuously raising our performance bar as we strive to become Earth's Best Employer. That's why you'll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional. BASIC QUALIFICATIONS - Experience in construction management or construction program management of large, complex projects involving large-scale mechanical, electrical, and plumbing (MEP) plants - Experience in construction of data center delivery (design, commissioning and construction), mission critical facilities, or equivalent industrial/manufacturing facility builds - Experience constructing electrical engineering systems including large scale power distribution/generation gear and mechanical engineering systems including cooling systems - Experience in project control (cost or schedule, or both) and formulating construction programmes, especially for infrastructure and mission critical projects both on-site and in preconstruction environments - Bachelor's degree in Mechanical Engineering, Electrical Engineering, Construction Management or an equivalent engineering science +7 Years of experience OR 12+ years of related construction management experience in lieu of a degree. PREFERRED QUALIFICATIONS - Experience delivering multi-media environmental due diligence, permitting, and compliance projects with specific expertise in CWA 404 and NPDES permitting, groundwater protection, wastewater discharge, and natural and cultural resource evaluations - Experience in Project Controls Standards subject matter, including Estimating, Cost Management, Cost Forecasting, Schedule Management, Progress Measurement, Change Management, Risk Management, WBS/CBS/SBS, Cash-Flow (VOWD), and Benchmarking - Experience in environmental compliance and permitting, waste management, contractual, regulatory, and liability assessments, environmental permit evaluations and applications, EIAs and water discharge requirements - Bachelor's degree in Construction Management Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status. Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit for more information. If the country/region you're applying in isn't listed, please contact your Recruiting Partner. The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at . USA, TX, Dallas - 139 000.00 USD annually
09/20/2026
Full time
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we're the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain - and we're looking for talented people who want to help. You'll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You'll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you'll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion. As our Data Center Construction Manager (CM) , you will be a part of a diverse, upbeat, and creative team tasked with solving fascinating problems constructing Amazon Data Centers. Our data centers are industry-leading examples of energy efficient and cost-effective designs. Key job responsibilities • Own project scope, quality, schedule, and budget for construction of new builds or general capital projects. • Own construction project management and oversight of construction related activities. • Work alongside partner teams such as Operations, Networking, Controls, Security, and Commissioning to build Data Centers that directly support our Customers. • Be a leader in your specific discipline (construction management, building services, architectural, electrical or mechanical engineering). • Represent Amazon's owner's representative on construction sites daily, as, interacting with construction trades. • Be Amazon's construction representative on multiple data centers building and capital improvement construction project sites from construction start through hand-off to operations. • Direct interface with construction general contractors during the construction bidding, award, execution, punch-list, and closeout phases. • Create construction project scope and request for proposals. • Conduct negotiations with general contractors and evaluate bids and proposals with detail and accuracy. • Manage and drive cost, schedule, and quality while managing construction contractors and vendors. • Perform construction project management activities, including management of documents, submittals, RFIs, change orders, invoices, quality, scope, and schedule. • Drive construction teams to troubleshoot and perform root-cause failure analysis on equipment failures. • Support commissioning and integrated system testing and oversight. • Support operations of installed facilities, including review of procedures, best practices, and maintenance initiatives. • Support capital request creation. • Analyze and report construction progress and financials. • Record and report key construction metrics to team members and management. • Contribute to construction initiatives aimed at improving construction efficiency and increasing data center resiliency. • Provide constructability reviews for electrical and mechanical designs for new or optimization of existing data centers. About the team Diverse Experiences Amazon values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn't followed a traditional path, or includes alternative experiences, don't let it stop you from applying. Why AWS Amazon Web Services (AWS) is the world's most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating - that's why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses. Work/Life Balance We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there's nothing we can't achieve in the cloud. Inclusive Team Culture Here at AWS, it's in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon (gender diversity) conferences, inspire us to never stop embracing our uniqueness. Mentorship and Career Growth We're continuously raising our performance bar as we strive to become Earth's Best Employer. That's why you'll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional. BASIC QUALIFICATIONS - Experience in construction management or construction program management of large, complex projects involving large-scale mechanical, electrical, and plumbing (MEP) plants - Experience in construction of data center delivery (design, commissioning and construction), mission critical facilities, or equivalent industrial/manufacturing facility builds - Experience constructing electrical engineering systems including large scale power distribution/generation gear and mechanical engineering systems including cooling systems - Experience in project control (cost or schedule, or both) and formulating construction programmes, especially for infrastructure and mission critical projects both on-site and in preconstruction environments - Bachelor's degree in Mechanical Engineering, Electrical Engineering, Construction Management or an equivalent engineering science +7 Years of experience OR 12+ years of related construction management experience in lieu of a degree. PREFERRED QUALIFICATIONS - Experience delivering multi-media environmental due diligence, permitting, and compliance projects with specific expertise in CWA 404 and NPDES permitting, groundwater protection, wastewater discharge, and natural and cultural resource evaluations - Experience in Project Controls Standards subject matter, including Estimating, Cost Management, Cost Forecasting, Schedule Management, Progress Measurement, Change Management, Risk Management, WBS/CBS/SBS, Cash-Flow (VOWD), and Benchmarking - Experience in environmental compliance and permitting, waste management, contractual, regulatory, and liability assessments, environmental permit evaluations and applications, EIAs and water discharge requirements - Bachelor's degree in Construction Management Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status. Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit for more information. If the country/region you're applying in isn't listed, please contact your Recruiting Partner. The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at . USA, TX, Dallas - 139 000.00 USD annually
Amazon Data Services, Inc.
Controls Technician, Data Center Capacity Delivery
Amazon Data Services, Inc. Trenton, Ohio
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we're the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain - and we're looking for talented people who want to help. You'll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You'll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you'll experience an inclusive culture that welcomes bold ideas and empowers you to own The Data Center Global Services team is looking for exceptional individuals to join our Controls organization as a Controls Technician for Service & Construction of the Building Management Systems (BMS) and Electrical Power Monitoring System (EPMS) within Amazon data centers. If you are passionate about the Customer Experience, think and act globally and have the ability to contribute to major new innovations in the area of building controls and automation this is the challenge you are looking for! The ideal candidate will possess technical background and experience in installation, troubleshooting and maintenance of field sensors, controllers, wiring, networking and programming associated with the industrial controls systems. Controls Technicians shall be responsible for participating in the installation, testing, troubleshooting and startup of equipment and controls system associated with the BMS and EPMS system deployment in the data centers. They will verify, configure, and troubleshoot field devices including Air Handler Unit (AHU) controllers, Variable Frequency Drives (VFDs), Temperature and Pressure Sensors, and Third Party Network or Serial Devices, controllers and network equipment. Key job responsibilities Primarily working in field at Data Center sites and supporting multiple sites under Deployment and/or Service. Perform point to point checkouts between field devices and controllers. Perform first-line diagnostics, troubleshooting and maintenance of instrumentation associated with the BMS and EPMS in data centers. Perform network configurations and communication testing between third party devices and controllers or servers. Configuration and calibration of sensors. Able to read and understand Electrical schematics, control panel drawings. Basic understanding of close loop controls, field sensors scaling, AND/OR functions typically performed by industrial controllers. Supervise low voltage electrical contractors who perform wiring and installation of field devices. Commissioning and systems level testing support. Provide red-lined drawings and recommendations based on field work and verify accuracy of as-built drawings. Assist in performing root cause analysis during testing and commissioning. Ensure all personnel on site utilize proper safety methodology. Work on-call and a rotating schedule when required and responds to after-hours emergencies. Perform basic support concepts such as ticketing systems, root cause analysis, and task prioritization. Physical Requirements: Walk jobsites in uneven terrain and work at heights and from ladders. Regularly walk, use hands and fingers, handle or feel, reach with hands and arms, stoop, kneel, crouch or craw. On occasions, lift and/or move up to 49 pounds; and participate in group lifts for 50 pounds or more. Work shifts longer than eight hours in duration. About the team Diverse Experiences AWS values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn't followed a traditional path, or includes alternative experiences, don't let it stop you from applying. Why AWS? Amazon Web Services (AWS) is the world's most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating - that's why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses. Inclusive Team Culture AWS values curiosity and connection. Our employee-led and company-sponsored affinity groups promote inclusion and empower our people to take pride in what makes us unique. Our inclusion events foster stronger, more collaborative teams. Our continual innovation is fueled by the bold ideas, fresh perspectives, and passionate voices our teams bring to everything we do. Mentorship & Career Growth We're continuously raising our performance bar as we strive to become Earth's Best Employer. That's why you'll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional. Work/Life Balance We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there's nothing we can't achieve. BASIC QUALIFICATIONS - Can lift and rack equipment up to 40 pounds - 3+ years of industrial controls and automation experience, or Bachelor's degree in computer science, electrical engineering, automation engineering, or equivalent - 1+ years of electrical or mechanical experience - Can lift and rack equipment up to 40 pounds - Basic understanding of Industrial controls system, knowledge of meters, devices, sensors, relays and troubleshooting utilizing standard hand tools, digital metering, or calibration/diagnostic equipment in a data center, hospitals, large commercial complex, water, power, oil & gas or similar industries. - Ability to work non-standard hours and differing work rotations/shifts and overtime as required. PREFERRED QUALIFICATIONS - Can work in cramped spaces or in elevated locations while adhering to health & safety guidelines - Experience working in data centers with an emphasis on building and equipment operation - Experience reviewing and understanding engineering design documents for electronic, mechanical and electro-mechanical parts and assembly drawings of products - Experience in a data center or other critical environment - Experience with Network Protocols: TCP/IP, Ethernet, L2/L3 technologies - Knowledge of network design, protocols and troubleshooting - 4+ years of professional or military, or 4+ years of professional or military experience - International Society of Automation (ISA) Certified Controls System Technician (CCST) Level I or higher certification. - 5+ years of experience in controls/automation, or construction/technical environment or related field. - Prior AWS/Amazon experience Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status. Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit for more information. If the country/region you're applying in isn't listed, please contact your Recruiting Partner. The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at . USA, OH, Trenton - 30.91 - 54.18 USD hourly
09/20/2026
Full time
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we're the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain - and we're looking for talented people who want to help. You'll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You'll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you'll experience an inclusive culture that welcomes bold ideas and empowers you to own The Data Center Global Services team is looking for exceptional individuals to join our Controls organization as a Controls Technician for Service & Construction of the Building Management Systems (BMS) and Electrical Power Monitoring System (EPMS) within Amazon data centers. If you are passionate about the Customer Experience, think and act globally and have the ability to contribute to major new innovations in the area of building controls and automation this is the challenge you are looking for! The ideal candidate will possess technical background and experience in installation, troubleshooting and maintenance of field sensors, controllers, wiring, networking and programming associated with the industrial controls systems. Controls Technicians shall be responsible for participating in the installation, testing, troubleshooting and startup of equipment and controls system associated with the BMS and EPMS system deployment in the data centers. They will verify, configure, and troubleshoot field devices including Air Handler Unit (AHU) controllers, Variable Frequency Drives (VFDs), Temperature and Pressure Sensors, and Third Party Network or Serial Devices, controllers and network equipment. Key job responsibilities Primarily working in field at Data Center sites and supporting multiple sites under Deployment and/or Service. Perform point to point checkouts between field devices and controllers. Perform first-line diagnostics, troubleshooting and maintenance of instrumentation associated with the BMS and EPMS in data centers. Perform network configurations and communication testing between third party devices and controllers or servers. Configuration and calibration of sensors. Able to read and understand Electrical schematics, control panel drawings. Basic understanding of close loop controls, field sensors scaling, AND/OR functions typically performed by industrial controllers. Supervise low voltage electrical contractors who perform wiring and installation of field devices. Commissioning and systems level testing support. Provide red-lined drawings and recommendations based on field work and verify accuracy of as-built drawings. Assist in performing root cause analysis during testing and commissioning. Ensure all personnel on site utilize proper safety methodology. Work on-call and a rotating schedule when required and responds to after-hours emergencies. Perform basic support concepts such as ticketing systems, root cause analysis, and task prioritization. Physical Requirements: Walk jobsites in uneven terrain and work at heights and from ladders. Regularly walk, use hands and fingers, handle or feel, reach with hands and arms, stoop, kneel, crouch or craw. On occasions, lift and/or move up to 49 pounds; and participate in group lifts for 50 pounds or more. Work shifts longer than eight hours in duration. About the team Diverse Experiences AWS values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn't followed a traditional path, or includes alternative experiences, don't let it stop you from applying. Why AWS? Amazon Web Services (AWS) is the world's most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating - that's why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses. Inclusive Team Culture AWS values curiosity and connection. Our employee-led and company-sponsored affinity groups promote inclusion and empower our people to take pride in what makes us unique. Our inclusion events foster stronger, more collaborative teams. Our continual innovation is fueled by the bold ideas, fresh perspectives, and passionate voices our teams bring to everything we do. Mentorship & Career Growth We're continuously raising our performance bar as we strive to become Earth's Best Employer. That's why you'll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional. Work/Life Balance We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there's nothing we can't achieve. BASIC QUALIFICATIONS - Can lift and rack equipment up to 40 pounds - 3+ years of industrial controls and automation experience, or Bachelor's degree in computer science, electrical engineering, automation engineering, or equivalent - 1+ years of electrical or mechanical experience - Can lift and rack equipment up to 40 pounds - Basic understanding of Industrial controls system, knowledge of meters, devices, sensors, relays and troubleshooting utilizing standard hand tools, digital metering, or calibration/diagnostic equipment in a data center, hospitals, large commercial complex, water, power, oil & gas or similar industries. - Ability to work non-standard hours and differing work rotations/shifts and overtime as required. PREFERRED QUALIFICATIONS - Can work in cramped spaces or in elevated locations while adhering to health & safety guidelines - Experience working in data centers with an emphasis on building and equipment operation - Experience reviewing and understanding engineering design documents for electronic, mechanical and electro-mechanical parts and assembly drawings of products - Experience in a data center or other critical environment - Experience with Network Protocols: TCP/IP, Ethernet, L2/L3 technologies - Knowledge of network design, protocols and troubleshooting - 4+ years of professional or military, or 4+ years of professional or military experience - International Society of Automation (ISA) Certified Controls System Technician (CCST) Level I or higher certification. - 5+ years of experience in controls/automation, or construction/technical environment or related field. - Prior AWS/Amazon experience Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status. Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit for more information. If the country/region you're applying in isn't listed, please contact your Recruiting Partner. The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at . USA, OH, Trenton - 30.91 - 54.18 USD hourly
Amazon Data Services, Inc.
Regional Program Manager, Construction Program Management
Amazon Data Services, Inc. Herndon, Virginia
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we're the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain - and we're looking for talented people who want to help. You'll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You'll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you'll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion. Amazon's Data Centers are industry leading examples of innovation in the areas of security, safety, space utilization, efficiency, and cost effectiveness. We are the global team responsible for the construction of the Amazon owned sites. Our Construction Managers are on the forefront of creating and delivering the most innovative products to our customers; and are known for changing the face of cloud computing. This Regional Construction Program Manager, will help implement solutions focused on improving processes, streamlining workflows and creating tools used by the field execution teams to deliver capacity more efficiently. They will work closely with internal and external partner (General Contractors) teams to ensure industry best practices, and innovative ideas, are being considered when new programs are being adopted by the Construction team. The Regional Construction Program Manager will assist Sr. leadership on determining what key metrics, reports and goals are necessary for new and existing programs to achieve business objectives. Key job responsibilities • Lead cross-functional teams and manage programs and processes simultaneously. • Engage with technical experts and key stakeholders to initiate new programs, including developing new processes and program documentation. • Identify process and communications gaps, while developing and driving solutions. • Develop and maintain lessons learned and establish mechanisms to share this with teams. • Work closely with stakeholders on key program initiatives to develop and implement procedures and systems that continually improve and streamline the program. • Drive simplification and automation to evolve processes, services, and solutions, to increase agility and efficiencies and lower costs. • Establish a metrics-driven, programmatic approach to strategic initiatives to develop improvements and efficiencies. • Gather, define, refine, and drive requirements for program process, standards, and system Implementation requirements needed to monitor & report on construction programs across multiple geographic regions with little or no direction from management. • Define & evaluate KPIs derived from program milestone, estimate, spend forecast, and cost/resource loaded schedule performance. A day in the life This resource can also work from one of the following locations if business need permitting: Data Center sites located in South Bend / Indiana, Atlanta, Jackson/Mississippi and Herndon/VA. About the team Why AWS Amazon Web Services (AWS) is the world's most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating - that's why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses. Diverse Experiences Amazon values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn't followed a traditional path, or includes alternative experiences, don't let it stop you from applying. Work/Life Balance We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there's nothing we can't achieve in the cloud. Inclusive Team Culture Here at AWS, it's in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon (gender diversity) conferences, inspire us to never stop embracing our uniqueness. Mentorship and Career Growth We're continuously raising our performance bar as we strive to become Earth's Best Employer. That's why you'll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional. BASIC QUALIFICATIONS - Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field - Experience carrying new design concepts through exploration, development, and into deployment or mass production - Experience in MS Excel, Word, and Windows Operating Systems - 5+ years of construction or project management experience PREFERRED QUALIFICATIONS - 5+ years of project management in data centers or comparable critical infrastructure experience - Knowledge of critical data center equipment - Knowledge of engineering documentation, electrical diagrams and standard operating procedures - Knowledge of building codes and regulations including Life Safety, BOCA, NFPA, NEC, or OSHA - Experience in project management in data centers or comparable critical infrastructure - Experience in Data Center Engineering Operations, with a deep understanding of electrical and mechanical data center infrastructure - Experience reading and interpreting construction specifications and drawings for all domains Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status. Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit for more information. If the country/region you're applying in isn't listed, please contact your Recruiting Partner. The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at . USA, VA, Herndon - 111 100.00 USD annually
09/20/2026
Full time
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we're the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain - and we're looking for talented people who want to help. You'll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You'll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you'll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion. Amazon's Data Centers are industry leading examples of innovation in the areas of security, safety, space utilization, efficiency, and cost effectiveness. We are the global team responsible for the construction of the Amazon owned sites. Our Construction Managers are on the forefront of creating and delivering the most innovative products to our customers; and are known for changing the face of cloud computing. This Regional Construction Program Manager, will help implement solutions focused on improving processes, streamlining workflows and creating tools used by the field execution teams to deliver capacity more efficiently. They will work closely with internal and external partner (General Contractors) teams to ensure industry best practices, and innovative ideas, are being considered when new programs are being adopted by the Construction team. The Regional Construction Program Manager will assist Sr. leadership on determining what key metrics, reports and goals are necessary for new and existing programs to achieve business objectives. Key job responsibilities • Lead cross-functional teams and manage programs and processes simultaneously. • Engage with technical experts and key stakeholders to initiate new programs, including developing new processes and program documentation. • Identify process and communications gaps, while developing and driving solutions. • Develop and maintain lessons learned and establish mechanisms to share this with teams. • Work closely with stakeholders on key program initiatives to develop and implement procedures and systems that continually improve and streamline the program. • Drive simplification and automation to evolve processes, services, and solutions, to increase agility and efficiencies and lower costs. • Establish a metrics-driven, programmatic approach to strategic initiatives to develop improvements and efficiencies. • Gather, define, refine, and drive requirements for program process, standards, and system Implementation requirements needed to monitor & report on construction programs across multiple geographic regions with little or no direction from management. • Define & evaluate KPIs derived from program milestone, estimate, spend forecast, and cost/resource loaded schedule performance. A day in the life This resource can also work from one of the following locations if business need permitting: Data Center sites located in South Bend / Indiana, Atlanta, Jackson/Mississippi and Herndon/VA. About the team Why AWS Amazon Web Services (AWS) is the world's most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating - that's why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses. Diverse Experiences Amazon values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn't followed a traditional path, or includes alternative experiences, don't let it stop you from applying. Work/Life Balance We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there's nothing we can't achieve in the cloud. Inclusive Team Culture Here at AWS, it's in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon (gender diversity) conferences, inspire us to never stop embracing our uniqueness. Mentorship and Career Growth We're continuously raising our performance bar as we strive to become Earth's Best Employer. That's why you'll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional. BASIC QUALIFICATIONS - Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field - Experience carrying new design concepts through exploration, development, and into deployment or mass production - Experience in MS Excel, Word, and Windows Operating Systems - 5+ years of construction or project management experience PREFERRED QUALIFICATIONS - 5+ years of project management in data centers or comparable critical infrastructure experience - Knowledge of critical data center equipment - Knowledge of engineering documentation, electrical diagrams and standard operating procedures - Knowledge of building codes and regulations including Life Safety, BOCA, NFPA, NEC, or OSHA - Experience in project management in data centers or comparable critical infrastructure - Experience in Data Center Engineering Operations, with a deep understanding of electrical and mechanical data center infrastructure - Experience reading and interpreting construction specifications and drawings for all domains Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status. Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit for more information. If the country/region you're applying in isn't listed, please contact your Recruiting Partner. The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at . USA, VA, Herndon - 111 100.00 USD annually
Electrical Support
Engineering Economics, Inc. South Bend, Indiana
Job Description Job Description Description: About the Position: At EEI, we believe in doing things the right way, with excellence, integrity, and genuine care for our people. As an employee-owned company, our People First culture is rooted in trust, accountability, and shared success. As a Mission Critical Electrical Support team member, you will work alongside experienced engineers and field technicians supporting the testing, verification, and documentation of electrical systems in data centers and high-reliability facilities. You will work closely with project managers, commissioning team members, clients, contractors, and vendors to help keep schedules, documentation, communications, and follow-up items on track - with the goal of helping ensure every mission critical facility we deliver performs exactly as designed. This position is ideal for someone with an electrical engineering degree or strong foundational experience in electrical systems who is detail-oriented, adaptable, and ready to grow by doing in a fast-paced, high-stakes environment. . Essential Responsibilities: Support the commissioning, testing, and troubleshooting of electrical building systems - including power distribution, lighting, wiring, and controls - to help verify each system performs as designed. Verify electrical installations against design specifications, industry standards, and regulatory requirements, and document findings thoroughly. Participate in system testing across a range of conditions - full load, no load, and failure scenarios, tracking issues and corrective actions through resolution. Coordinate with engineers, contractors, and vendors in the field to resolve commissioning issues and support project delivery. Conduct site inspections and ensure all commissioning activities are carried out in compliance with safety standards, site-specific protocols, and EEI requirements. Qualifications: Experience or exposure in electrical systems, facilities operations, commissioning, construction, engineering, maintenance, building operations, military electrical work, or a related technical environment. Basic understanding of electrical equipment, facility systems, construction activities, or technical field work, with a willingness to continue learning. Ability to learn technical concepts and apply them in both office and field environments. Ability to read and interpret technical documentation, drawings, and system information with guidance. Strong organizational, problem-solving, communication, and teamwork skills. Proficiency with Microsoft Office Suite and the ability to learn commissioning documentation tools or project software. Currently authorized to work in the U.S. full-time without the need for sponsorship now or in the future. Preferred Associate's or Bachelor's degree in Electrical Engineering, Engineering Technology, Facilities Management, Construction Management, Building Systems, or a related field. Exposure to power distribution systems, switchgear, UPS systems, generators, controls, building automation systems, commissioning, data centers, or mission-critical facilities. Hands-on technical experience through internships, technician roles, trade programs, military service, facility operations, maintenance, or field-based project work. Interest in developing a long-term career in commissioning, building performance, data centers, or mission-critical operations. Working Conditions: Typical Travel: Up to 75%. Travel requirements vary by project and individual location. Work Environment: Hybrid environment of office and field-based work for site visits. Site visits may include mission-critical facilities, data centers, active construction environments, mechanical rooms, uneven ground, varying weather conditions, and field interactions. Physical Requirements: Must be able to perform site inspections, which may include walking project sites, climbing ladders, occasionally lifting and carrying up to 50 lbs, and working in confined spaces when needed. Reasonable accommodation may be provided. Reports to: Electrical Lead or assigned project technical lead. Supervisory duties: This role is primarily an individual contributor and does not require direct supervisory responsibility unless assigned. Partners with: Contractors, subcontractors, vendors, and equipment manufacturers on project sites, as well as internal project engineers and senior technical team members across disciplines. Key Representative to: EEI clients, contractors, vendors, and project stakeholders. About EEI: EEI is a recognized leader in facility and energy consulting. We deliver innovative, performance-focused solutions that maximize building performance, extend system lifecycles, and reduce utility costs. This dedication has earned us trusted partnerships with Fortune 500 organizations, national healthcare networks, prestigious universities, and leading government agencies. Nationally recognized for building commissioning and building performance, EEI also provides facility assessments, master planning, energy audits, and technical program management, supported by specialty teams serving healthcare, data center, and mission-critical facilities. Our reputation is built by the people who lead our work every day, that's why our values aren't just words; they are lived out daily in how we make decisions, build trusted relationships, and deliver quality. As an employee-owned company, we share success through our Employee Stock Ownership Plan (ESOP), reflecting our commitment to building something meaningful together. And as EEI rapidly grows, we're looking for talented people who want meaningful work, a supportive team, and room to grow. Learn more at: Benefits: Taking care of our people is our highest priority. We're committed to creating a workplace where our people are supported through meaningful connection, genuine care, and real opportunities to grow. That's why we provide the benefits, tools, and resources our team needs to thrive and do their best work. • Employee Stock Ownership Plan (ESOP); 100% employer funded • Health, dental, and vision insurance • Flexible Spending Accounts (FSAs) • Health Savings Accounts (HSAs) • Company-paid LTD, STD, and basic life insurance • Voluntary life, accident coverage, critical illness, and hospital indemnity insurance • Profit-sharing + discretionary performance bonuses • 401(k) retirement plan with company match; 100% immediate vesting • Vacation + sick time • Eight (8) paid holidays, two (2) floating holiday • Parental Leave • Milestone Travel Award (Every 5 Years) • Remote first company • Paid certifications, seminars, and conferences • Professional development opportunities PEOPLE + BUILDING + PERFORMANCE EEI is a proud equal opportunity employer. We value a diverse workforce and are committed to an inclusive culture. EEI does not discriminate on the basis of race, color, ethnicity, ancestry, religion, sex, national origin, sexual orientation, age, citizenship status, marital status, disability, gender identity, gender expression, veteran status, or genetic information. EEI participates in E-Verify and will provide the federal government with your completed Form I-9 to confirm your work authorization in the United States Attention Search Firms / Third-Party Recruiters: EEI is not seeking assistance or accepting unsolicited resumes for this role. Resumes submitted without a valid written search agreement are the sole property of EEI; no fee will be paid if a candidate is hired. Requirements:
09/20/2026
Full time
Job Description Job Description Description: About the Position: At EEI, we believe in doing things the right way, with excellence, integrity, and genuine care for our people. As an employee-owned company, our People First culture is rooted in trust, accountability, and shared success. As a Mission Critical Electrical Support team member, you will work alongside experienced engineers and field technicians supporting the testing, verification, and documentation of electrical systems in data centers and high-reliability facilities. You will work closely with project managers, commissioning team members, clients, contractors, and vendors to help keep schedules, documentation, communications, and follow-up items on track - with the goal of helping ensure every mission critical facility we deliver performs exactly as designed. This position is ideal for someone with an electrical engineering degree or strong foundational experience in electrical systems who is detail-oriented, adaptable, and ready to grow by doing in a fast-paced, high-stakes environment. . Essential Responsibilities: Support the commissioning, testing, and troubleshooting of electrical building systems - including power distribution, lighting, wiring, and controls - to help verify each system performs as designed. Verify electrical installations against design specifications, industry standards, and regulatory requirements, and document findings thoroughly. Participate in system testing across a range of conditions - full load, no load, and failure scenarios, tracking issues and corrective actions through resolution. Coordinate with engineers, contractors, and vendors in the field to resolve commissioning issues and support project delivery. Conduct site inspections and ensure all commissioning activities are carried out in compliance with safety standards, site-specific protocols, and EEI requirements. Qualifications: Experience or exposure in electrical systems, facilities operations, commissioning, construction, engineering, maintenance, building operations, military electrical work, or a related technical environment. Basic understanding of electrical equipment, facility systems, construction activities, or technical field work, with a willingness to continue learning. Ability to learn technical concepts and apply them in both office and field environments. Ability to read and interpret technical documentation, drawings, and system information with guidance. Strong organizational, problem-solving, communication, and teamwork skills. Proficiency with Microsoft Office Suite and the ability to learn commissioning documentation tools or project software. Currently authorized to work in the U.S. full-time without the need for sponsorship now or in the future. Preferred Associate's or Bachelor's degree in Electrical Engineering, Engineering Technology, Facilities Management, Construction Management, Building Systems, or a related field. Exposure to power distribution systems, switchgear, UPS systems, generators, controls, building automation systems, commissioning, data centers, or mission-critical facilities. Hands-on technical experience through internships, technician roles, trade programs, military service, facility operations, maintenance, or field-based project work. Interest in developing a long-term career in commissioning, building performance, data centers, or mission-critical operations. Working Conditions: Typical Travel: Up to 75%. Travel requirements vary by project and individual location. Work Environment: Hybrid environment of office and field-based work for site visits. Site visits may include mission-critical facilities, data centers, active construction environments, mechanical rooms, uneven ground, varying weather conditions, and field interactions. Physical Requirements: Must be able to perform site inspections, which may include walking project sites, climbing ladders, occasionally lifting and carrying up to 50 lbs, and working in confined spaces when needed. Reasonable accommodation may be provided. Reports to: Electrical Lead or assigned project technical lead. Supervisory duties: This role is primarily an individual contributor and does not require direct supervisory responsibility unless assigned. Partners with: Contractors, subcontractors, vendors, and equipment manufacturers on project sites, as well as internal project engineers and senior technical team members across disciplines. Key Representative to: EEI clients, contractors, vendors, and project stakeholders. About EEI: EEI is a recognized leader in facility and energy consulting. We deliver innovative, performance-focused solutions that maximize building performance, extend system lifecycles, and reduce utility costs. This dedication has earned us trusted partnerships with Fortune 500 organizations, national healthcare networks, prestigious universities, and leading government agencies. Nationally recognized for building commissioning and building performance, EEI also provides facility assessments, master planning, energy audits, and technical program management, supported by specialty teams serving healthcare, data center, and mission-critical facilities. Our reputation is built by the people who lead our work every day, that's why our values aren't just words; they are lived out daily in how we make decisions, build trusted relationships, and deliver quality. As an employee-owned company, we share success through our Employee Stock Ownership Plan (ESOP), reflecting our commitment to building something meaningful together. And as EEI rapidly grows, we're looking for talented people who want meaningful work, a supportive team, and room to grow. Learn more at: Benefits: Taking care of our people is our highest priority. We're committed to creating a workplace where our people are supported through meaningful connection, genuine care, and real opportunities to grow. That's why we provide the benefits, tools, and resources our team needs to thrive and do their best work. • Employee Stock Ownership Plan (ESOP); 100% employer funded • Health, dental, and vision insurance • Flexible Spending Accounts (FSAs) • Health Savings Accounts (HSAs) • Company-paid LTD, STD, and basic life insurance • Voluntary life, accident coverage, critical illness, and hospital indemnity insurance • Profit-sharing + discretionary performance bonuses • 401(k) retirement plan with company match; 100% immediate vesting • Vacation + sick time • Eight (8) paid holidays, two (2) floating holiday • Parental Leave • Milestone Travel Award (Every 5 Years) • Remote first company • Paid certifications, seminars, and conferences • Professional development opportunities PEOPLE + BUILDING + PERFORMANCE EEI is a proud equal opportunity employer. We value a diverse workforce and are committed to an inclusive culture. EEI does not discriminate on the basis of race, color, ethnicity, ancestry, religion, sex, national origin, sexual orientation, age, citizenship status, marital status, disability, gender identity, gender expression, veteran status, or genetic information. EEI participates in E-Verify and will provide the federal government with your completed Form I-9 to confirm your work authorization in the United States Attention Search Firms / Third-Party Recruiters: EEI is not seeking assistance or accepting unsolicited resumes for this role. Resumes submitted without a valid written search agreement are the sole property of EEI; no fee will be paid if a candidate is hired. Requirements:
Senior Risk Manager - Data Center Construction
Turner and Townsend Grapeland, Texas
Job Description Job Description Company Description Turner & Townsend is a global professional services company with over 22,000 people in more than 60 countries. Working with our clients across real estate, infrastructure, energy and natural resources, we transform together delivering outcomes that improve people's lives. Working in partnership makes it possible to deliver the world's most impactful projects and programmes as we turn challenge into opportunity and complexity into success. Our capabilities include programme, project, cost, asset and commercial management, controls and performance, procurement and supply chain, net zero and digital solutions. We are majority-owned by CBRE Group, Inc., the world's largest commercial real estate services and investment firm, with our partners holding a significant minority interest. Turner & Townsend and CBRE work together to provide clients with the premier programme, project and cost management offering in markets around the world. Job Description Turner & Townsend is looking for Senior Risk Manager to join our growing team. The ideal individual will be an experienced risk professional that has supported large scale construction projects. Responsibilities: Maintain visibility of threat/opportunity trigger points to facilitate risk cost profiling, timely drawdown of risk budget or retirement of threat/opportunity. Use risk data to inform investment planning. Monitor overall risk exposure and assess the remaining risk budget. Work with contractors to assess contractors held risks and their views on client held risks that impact upon them. Produce risk reports as required, in a timely manner, to support the effective communication of threat and opportunity status. Conduct quantitative risk assessment (cost and schedule) to inform project contingency levels. Initiate a proactive approach to the review, development and improvement of risk management services for the client. Undertake end-to-end project risk management practices on multiple projects/programs. Undertake the creation of risk management plans and processes in adherence to client requirements, processes, policies, and frameworks. Conduct risk reviews at regular intervals, identify and analyze, determine response plans, ensure that project and program risk profiles are being monitored and reported. Lead and run a comprehensive schedule and cost-effective risk assessment (QCRA & QSRA) process is delivered. Establish integration of the risk management function within the program and project controls team, with direct touch points to cost and schedule management, change control, and reporting. Work proactively and collaboratively with program and project control teams to eliminate redundancies and identify improvement opportunities. Provide opportunities to facilitate the transfer of knowledge within the immediate risk team, to the greater project controls team, and to the client. The transfer of knowledge may include informal one-on-one discussions with client stakeholders and more formal presentations to clients and colleagues. Create value stream mapping to quantify pain points and develop solutions to minimize waste (both in terms of speed and cost). Collaborate on the supplier performance management program including the collection of performance metrics and tracking supplier improvement action plans. Demonstrate a level of support to expert witnesses in arbitral or ligation processes. Lead, manage, and carry out construction stage contract and claims management. Carry out assessment of contractual claims in accordance with the contract. Provide strategic and contractual advice on disputes and related resolution issues. Evaluate delay recovery measures. Carry out change management and construction stage cost control. Supervise the measurement and valuation of completed works and variations. Manage the settlement of final accounts with contractors SOX control responsibilities may be part of this role, which are to be adhered to where applicable. Qualifications Bachelor's degree in construction management, cost management, quantity surveying, engineering or field related to construction. Minimum 5-7 years of applicable experience Relevant construction project procurement and contract management experience. Demonstrated experience within a Program Management or Program Controls environment Deep knowledge and experience with risk identification, facilitation and techniques. Strong communication, analytical and negotiation skills. In-depth understanding of construction contracts, commercial models, and delivery methods. Proficient in process mapping, root causes analysis, problem solving, and value-stream mapping. Familiarity with web-based database tools - ARM, Predict, Tableau Highly self-motivated, analytical, and customer centric. Excellent communication skills. Additional Information The salary range for this full-time role is $120K-170K per year. Ranges are determined by role and level and represent a good faith effort to provide a fair and equitable salary. This range is a reflection of base salary only, not of a total compensation package. Please note Turner & Townsend reserves the right to pay more or less than the posted range, depending on candidate's experience and qualifications. On-site presence and requirements may change depending on our clients' needs. Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change. We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance. Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community. Please find out more about us at Turner & Townsend does not accept any speculative or unsolicited CV's that have been sent to our internal recruitment team or hiring managers from agencies outside of our preferred supplier list or that have not followed due process. Any speculative or unsolicited CV's will be treated as a direct application. All your information will be kept confidential according to EEO guidelines. Join our social media conversations for more information about Turner & Townsend and our exciting future projects: Twitter Instagram LinkedIn It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time. Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review.
09/20/2026
Full time
Job Description Job Description Company Description Turner & Townsend is a global professional services company with over 22,000 people in more than 60 countries. Working with our clients across real estate, infrastructure, energy and natural resources, we transform together delivering outcomes that improve people's lives. Working in partnership makes it possible to deliver the world's most impactful projects and programmes as we turn challenge into opportunity and complexity into success. Our capabilities include programme, project, cost, asset and commercial management, controls and performance, procurement and supply chain, net zero and digital solutions. We are majority-owned by CBRE Group, Inc., the world's largest commercial real estate services and investment firm, with our partners holding a significant minority interest. Turner & Townsend and CBRE work together to provide clients with the premier programme, project and cost management offering in markets around the world. Job Description Turner & Townsend is looking for Senior Risk Manager to join our growing team. The ideal individual will be an experienced risk professional that has supported large scale construction projects. Responsibilities: Maintain visibility of threat/opportunity trigger points to facilitate risk cost profiling, timely drawdown of risk budget or retirement of threat/opportunity. Use risk data to inform investment planning. Monitor overall risk exposure and assess the remaining risk budget. Work with contractors to assess contractors held risks and their views on client held risks that impact upon them. Produce risk reports as required, in a timely manner, to support the effective communication of threat and opportunity status. Conduct quantitative risk assessment (cost and schedule) to inform project contingency levels. Initiate a proactive approach to the review, development and improvement of risk management services for the client. Undertake end-to-end project risk management practices on multiple projects/programs. Undertake the creation of risk management plans and processes in adherence to client requirements, processes, policies, and frameworks. Conduct risk reviews at regular intervals, identify and analyze, determine response plans, ensure that project and program risk profiles are being monitored and reported. Lead and run a comprehensive schedule and cost-effective risk assessment (QCRA & QSRA) process is delivered. Establish integration of the risk management function within the program and project controls team, with direct touch points to cost and schedule management, change control, and reporting. Work proactively and collaboratively with program and project control teams to eliminate redundancies and identify improvement opportunities. Provide opportunities to facilitate the transfer of knowledge within the immediate risk team, to the greater project controls team, and to the client. The transfer of knowledge may include informal one-on-one discussions with client stakeholders and more formal presentations to clients and colleagues. Create value stream mapping to quantify pain points and develop solutions to minimize waste (both in terms of speed and cost). Collaborate on the supplier performance management program including the collection of performance metrics and tracking supplier improvement action plans. Demonstrate a level of support to expert witnesses in arbitral or ligation processes. Lead, manage, and carry out construction stage contract and claims management. Carry out assessment of contractual claims in accordance with the contract. Provide strategic and contractual advice on disputes and related resolution issues. Evaluate delay recovery measures. Carry out change management and construction stage cost control. Supervise the measurement and valuation of completed works and variations. Manage the settlement of final accounts with contractors SOX control responsibilities may be part of this role, which are to be adhered to where applicable. Qualifications Bachelor's degree in construction management, cost management, quantity surveying, engineering or field related to construction. Minimum 5-7 years of applicable experience Relevant construction project procurement and contract management experience. Demonstrated experience within a Program Management or Program Controls environment Deep knowledge and experience with risk identification, facilitation and techniques. Strong communication, analytical and negotiation skills. In-depth understanding of construction contracts, commercial models, and delivery methods. Proficient in process mapping, root causes analysis, problem solving, and value-stream mapping. Familiarity with web-based database tools - ARM, Predict, Tableau Highly self-motivated, analytical, and customer centric. Excellent communication skills. Additional Information The salary range for this full-time role is $120K-170K per year. Ranges are determined by role and level and represent a good faith effort to provide a fair and equitable salary. This range is a reflection of base salary only, not of a total compensation package. Please note Turner & Townsend reserves the right to pay more or less than the posted range, depending on candidate's experience and qualifications. On-site presence and requirements may change depending on our clients' needs. Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change. We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance. Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community. Please find out more about us at Turner & Townsend does not accept any speculative or unsolicited CV's that have been sent to our internal recruitment team or hiring managers from agencies outside of our preferred supplier list or that have not followed due process. Any speculative or unsolicited CV's will be treated as a direct application. All your information will be kept confidential according to EEO guidelines. Join our social media conversations for more information about Turner & Townsend and our exciting future projects: Twitter Instagram LinkedIn It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time. Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review.
BMS Estimator (Remote)
Mantis Innovation Grapeland, Texas
Job Description Job Description About Mantis We help organizations improve how their buildings perform by bringing together energy, facility operations, and sustainability into one connected approach. At Mantis, our teams work across the full lifecycle of a facility-from planning and design to field execution and long-term asset management-across commercial and industrial portfolios, data centers, and complex mechanical systems. Our work spans four core areas: Building Controls, Energy Efficiency, Energy Advisory, and Facility Management-covering HVAC/mechanical optimization, BMS/BAS and EPMS controls, lighting system upgrades, energy brokerage, roofing and building envelope assessments, construction management, and more. Whether you're in sales, engineering, construction/project management, field operations, corporate, or technology, you'll play a role in delivering these solutions and helping clients improve facility performance. Position Summary The BMS Estimator is responsible for developing accurate cost estimates and proposals for Building Management Systems (BMS), Building Automation Systems (BAS), HVAC controls, energy management, EPMS integration, and related facility automation projects. The successful candidate combines controls expertise, construction knowledge, operational understanding, and commercial judgment to create competitive and profitable proposals for commercial, industrial, healthcare, pharmaceutical, higher education, and mission-critical data center projects. Key Responsibilities Review construction drawings, specifications, submittals, and bid packages to determine actual BMS/BAS project scope. Responsible for clarifying the SOW by issuing Requests For Information (RFIs) during the bid process Develop equipment counts, point counts, material takeoffs, labor estimates, software requirements, and pricing summaries. Prepare customer-facing proposals, scope documents, exclusions, assumptions, qualifications, and bid summaries. Identify constructability concerns, design conflicts, coordination issues, scope gaps, and commercial risks before contract award. Review revised drawing packages and evaluate impacts to labor, materials, schedule, commissioning requirements, and execution strategy. Solicit, evaluate, and level vendor and subcontractor quotations. Support project handoff activities, change order pricing, and scope evaluations during project execution. Evaluate integration requirements involving BAS, BMS, EPMS, SCADA, DCIM, lighting controls, utility monitoring systems, and third-party integrations. Participate in customer meetings, site walks, pre-bid conferences, and internal estimate reviews. Required Qualifications 5+ years of experience in BMS/BAS, Controls Engineering, Controls Project Management, Controls Field Service, Solutions Engineering, System Integration, or related environments. Ability to read and interpret mechanical, electrical, controls, and construction drawings and specifications. Strong knowledge of HVAC controls, DDC controls, commissioning practices, and operational building systems. Experience developing project scope from construction documents. Strong analytical, organizational, communication, and commercial skills. Preferred Qualifications Experience as a Controls Technician, Controls Engineer, Controls Project Manager, Systems Engineer, Solutions Engineer, or Operations Manager. Experience in mission-critical environments including data centers, healthcare, laboratories, utilities, industrial facilities, central plants, and large commercial facilities. Experience with Niagara, Automated Logic, Schneider Electric EcoStruxure, Siemens Desigo, Johnson Controls Metasys, Honeywell EBI, Distech, or similar platforms. Knowledge of BACnet, Modbus, LonWorks, SNMP, and integrated building systems. Experience commissioning, integrating, programming, troubleshooting, or supporting controls systems. Technical Skills Building Management Systems (BMS) Building Automation Systems (BAS) EPMS, SCADA, and DCIM Systems HVAC and DDC Controls Cost Estimating and Budgeting Bluebeam AutoCAD Revit (Preferred) Microsoft Excel ERP and Project Management Software Typical Deliverables Detailed Cost Estimates Bid Proposals and Quotations Scope of Work Documents Material Takeoffs Labor Forecasts Project Budgets Change Order Pricing Value Engineering Recommendations Working Conditions Work is performed in office, remote, and active project environments with periodic travel based on project and customer needs. Note: Employees are held accountable for all duties of this job. This job description is not intended to be an exhaustive list of all duties, responsibilities, or qualifications associated with the position. What else can we offer you? We offer a fantastic lineup of benefits, including Medical, Dental, Vision, FSA, HSA, 401k Matching, Paid Vacation, Paid Sick, Paid Holidays, Paid Parental Leave, Paid Short Term & Long Term Disability, Tuition Reimbursement, and a flexible hybrid work schedule (for office-based employees). Working at Mantis also brings tremendous professional development opportunities that allow you to make a real impact on both the company and your career! Not sure you meet every single requirement? Studies show that women and individuals from underrepresented groups often hesitate to apply unless they check every box. At Mantis, we're committed to building an inclusive and equitable team-so if this role excites you, we'd love to hear from you, even if your experience doesn't match every single qualification. Mantis Innovation is an equal opportunity employer and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, disability status, protected veteran status, or any other characteristic protected by law. We may use artificial intelligence (AI) tools to support parts of the hiring process, such as reviewing applications, analyzing resumes, or assessing responses and identifying potential inconsistencies or verification signals in application materials based on available information. These tools assist our recruitment team but do not replace human judgment. Final hiring decisions are ultimately made by humans. If you would like more information about how your data is processed, please contact us.
09/20/2026
Full time
Job Description Job Description About Mantis We help organizations improve how their buildings perform by bringing together energy, facility operations, and sustainability into one connected approach. At Mantis, our teams work across the full lifecycle of a facility-from planning and design to field execution and long-term asset management-across commercial and industrial portfolios, data centers, and complex mechanical systems. Our work spans four core areas: Building Controls, Energy Efficiency, Energy Advisory, and Facility Management-covering HVAC/mechanical optimization, BMS/BAS and EPMS controls, lighting system upgrades, energy brokerage, roofing and building envelope assessments, construction management, and more. Whether you're in sales, engineering, construction/project management, field operations, corporate, or technology, you'll play a role in delivering these solutions and helping clients improve facility performance. Position Summary The BMS Estimator is responsible for developing accurate cost estimates and proposals for Building Management Systems (BMS), Building Automation Systems (BAS), HVAC controls, energy management, EPMS integration, and related facility automation projects. The successful candidate combines controls expertise, construction knowledge, operational understanding, and commercial judgment to create competitive and profitable proposals for commercial, industrial, healthcare, pharmaceutical, higher education, and mission-critical data center projects. Key Responsibilities Review construction drawings, specifications, submittals, and bid packages to determine actual BMS/BAS project scope. Responsible for clarifying the SOW by issuing Requests For Information (RFIs) during the bid process Develop equipment counts, point counts, material takeoffs, labor estimates, software requirements, and pricing summaries. Prepare customer-facing proposals, scope documents, exclusions, assumptions, qualifications, and bid summaries. Identify constructability concerns, design conflicts, coordination issues, scope gaps, and commercial risks before contract award. Review revised drawing packages and evaluate impacts to labor, materials, schedule, commissioning requirements, and execution strategy. Solicit, evaluate, and level vendor and subcontractor quotations. Support project handoff activities, change order pricing, and scope evaluations during project execution. Evaluate integration requirements involving BAS, BMS, EPMS, SCADA, DCIM, lighting controls, utility monitoring systems, and third-party integrations. Participate in customer meetings, site walks, pre-bid conferences, and internal estimate reviews. Required Qualifications 5+ years of experience in BMS/BAS, Controls Engineering, Controls Project Management, Controls Field Service, Solutions Engineering, System Integration, or related environments. Ability to read and interpret mechanical, electrical, controls, and construction drawings and specifications. Strong knowledge of HVAC controls, DDC controls, commissioning practices, and operational building systems. Experience developing project scope from construction documents. Strong analytical, organizational, communication, and commercial skills. Preferred Qualifications Experience as a Controls Technician, Controls Engineer, Controls Project Manager, Systems Engineer, Solutions Engineer, or Operations Manager. Experience in mission-critical environments including data centers, healthcare, laboratories, utilities, industrial facilities, central plants, and large commercial facilities. Experience with Niagara, Automated Logic, Schneider Electric EcoStruxure, Siemens Desigo, Johnson Controls Metasys, Honeywell EBI, Distech, or similar platforms. Knowledge of BACnet, Modbus, LonWorks, SNMP, and integrated building systems. Experience commissioning, integrating, programming, troubleshooting, or supporting controls systems. Technical Skills Building Management Systems (BMS) Building Automation Systems (BAS) EPMS, SCADA, and DCIM Systems HVAC and DDC Controls Cost Estimating and Budgeting Bluebeam AutoCAD Revit (Preferred) Microsoft Excel ERP and Project Management Software Typical Deliverables Detailed Cost Estimates Bid Proposals and Quotations Scope of Work Documents Material Takeoffs Labor Forecasts Project Budgets Change Order Pricing Value Engineering Recommendations Working Conditions Work is performed in office, remote, and active project environments with periodic travel based on project and customer needs. Note: Employees are held accountable for all duties of this job. This job description is not intended to be an exhaustive list of all duties, responsibilities, or qualifications associated with the position. What else can we offer you? We offer a fantastic lineup of benefits, including Medical, Dental, Vision, FSA, HSA, 401k Matching, Paid Vacation, Paid Sick, Paid Holidays, Paid Parental Leave, Paid Short Term & Long Term Disability, Tuition Reimbursement, and a flexible hybrid work schedule (for office-based employees). Working at Mantis also brings tremendous professional development opportunities that allow you to make a real impact on both the company and your career! Not sure you meet every single requirement? Studies show that women and individuals from underrepresented groups often hesitate to apply unless they check every box. At Mantis, we're committed to building an inclusive and equitable team-so if this role excites you, we'd love to hear from you, even if your experience doesn't match every single qualification. Mantis Innovation is an equal opportunity employer and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, disability status, protected veteran status, or any other characteristic protected by law. We may use artificial intelligence (AI) tools to support parts of the hiring process, such as reviewing applications, analyzing resumes, or assessing responses and identifying potential inconsistencies or verification signals in application materials based on available information. These tools assist our recruitment team but do not replace human judgment. Final hiring decisions are ultimately made by humans. If you would like more information about how your data is processed, please contact us.
Senior Manager, Information Management & BIM
MP Materials Corp. Fort Worth, Texas
Job Description Job Description Company Overview: MP Materials (NYSE: MP) is rebuilding American industrial capability for a new era of autonomy, robotics, and electrification. We are the only U.S. company with a fully integrated rare earth supply chain-from mining and refining to advanced metal and magnet manufacturing. Our products include both the critical materials used to make permanent magnets and the finished magnets themselves-enabling next-generation technologies in robotics, automation, aerospace, transportation, defense, and energy systems. These materials are the foundation of physical AI-the convergence of computation, movement, and control. We hire ambitious, mission-driven people who want to tackle complex challenges and shape the future of strategic industries. Our culture is rooted in teamwork, resiliency, and integrity, with a deep commitment to operational excellence and national purpose. MP is rapidly evolving from a materials producer into a leading U.S. manufacturer-and our people are driving that transformation. Position Overview: The Senior Manager, Information Management & BIM leads the strategy, governance, and execution of information management, building information modeling (BIM), and digital project delivery across the Capital Projects organization. This role is responsible for ensuring all project data, documents, and 3D models are structured, integrated, and aligned to support efficient project execution and a seamless transition to Operations. Reporting within the Capital Projects organization, this position plays a critical role in enabling data-driven decision-making, model based execution, and lifecycle asset integrity. Position Responsibilities: Lead the development and execution of the Information Management (IM) and BIM strategy across all capital projects. Establish standards, governance, and processes for document management, data structures, and 3D model development. Oversee creation, integration, and quality of BIM models (3D/4D/5D as applicable) to support engineering, construction, and commissioning activities. Ensure alignment between BIM models, engineering documentation, and asset data to enable accurate system handover to Operations. Drive adoption of digital project delivery tools and workflows, including model-based collaboration and visualization. Collaborate with engineering, construction, commissioning, and IT teams to ensure seamless integration of systems, models, and project data. Oversee document management systems (DMS), common data environments (CDE), and related platforms to ensure accessibility, version control, and data integrity. Ensure all project information and models meet internal standards, contractual requirements, and industry best practices. Support project controls integration (schedule, cost, progress tracking) through BIM enabled processes where applicable. Lead and develop a team of IM, BIM, and digital delivery professionals, building organizational capability and consistency across projects. Drive continuous improvement by incorporating lessons learned and emerging technologies to enhance project delivery and operational readiness. Basic Qualifications: Bachelor's degree in Engineering, Construction Management, Architecture, or related field (or equivalent experience). 10+ years of experience in capital projects, with significant exposure to information management and BIM/digital delivery. Proven experience leading BIM implementation and information management programs on large-scale industrial or infrastructure projects. Strong understanding of project lifecycle phases (engineering, procurement, construction, commissioning, handover). Experience with BIM tools and platforms (e.g., Navisworks, Revit, Bentley, Autodesk Construction Cloud, or similar). Experience with document management systems and common data environments. Demonstrated leadership capability managing cross-functional teams and stakeholders. Desired Qualities: Experience in mining, energy, chemicals, or heavy industrial sectors. Familiarity with asset data integration into ERP/EAM systems (e.g., SAP) and digital twin concepts. Experience with advanced BIM applications (4D scheduling, 5D cost integration, clash detection, model-based construction planning). Knowledge of industry standards (ISO 19650, digital delivery frameworks, etc.). MP Materials is Proud to be an Equal Opportunity / Affirmative Action Employer - EEO is The Law. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability, protected veteran status, or any other characteristic protected by law. Underrepresented groups/Women/Disabled/Veterans are encouraged to apply. Candidates whose disabilities make them unable to meet the position's requirements will still be considered qualified if they can perform the essential functions of the job with reasonable accommodation. Your Right to Work - In compliance with federal law, all persons hired will be required to verify identity and eligibility to work in the United States and to complete the required employment verification document form upon hire. For Assistance with Application - Alternative methods of applying for employment are available to individuals unable to submit an application through this site because of a disability. Contact Human Resources Department at ; 1700 South Pavilion Center Dr. 8th Floor, Las Vegas, NV 89135 to discuss reasonable accommodation.
09/20/2026
Full time
Job Description Job Description Company Overview: MP Materials (NYSE: MP) is rebuilding American industrial capability for a new era of autonomy, robotics, and electrification. We are the only U.S. company with a fully integrated rare earth supply chain-from mining and refining to advanced metal and magnet manufacturing. Our products include both the critical materials used to make permanent magnets and the finished magnets themselves-enabling next-generation technologies in robotics, automation, aerospace, transportation, defense, and energy systems. These materials are the foundation of physical AI-the convergence of computation, movement, and control. We hire ambitious, mission-driven people who want to tackle complex challenges and shape the future of strategic industries. Our culture is rooted in teamwork, resiliency, and integrity, with a deep commitment to operational excellence and national purpose. MP is rapidly evolving from a materials producer into a leading U.S. manufacturer-and our people are driving that transformation. Position Overview: The Senior Manager, Information Management & BIM leads the strategy, governance, and execution of information management, building information modeling (BIM), and digital project delivery across the Capital Projects organization. This role is responsible for ensuring all project data, documents, and 3D models are structured, integrated, and aligned to support efficient project execution and a seamless transition to Operations. Reporting within the Capital Projects organization, this position plays a critical role in enabling data-driven decision-making, model based execution, and lifecycle asset integrity. Position Responsibilities: Lead the development and execution of the Information Management (IM) and BIM strategy across all capital projects. Establish standards, governance, and processes for document management, data structures, and 3D model development. Oversee creation, integration, and quality of BIM models (3D/4D/5D as applicable) to support engineering, construction, and commissioning activities. Ensure alignment between BIM models, engineering documentation, and asset data to enable accurate system handover to Operations. Drive adoption of digital project delivery tools and workflows, including model-based collaboration and visualization. Collaborate with engineering, construction, commissioning, and IT teams to ensure seamless integration of systems, models, and project data. Oversee document management systems (DMS), common data environments (CDE), and related platforms to ensure accessibility, version control, and data integrity. Ensure all project information and models meet internal standards, contractual requirements, and industry best practices. Support project controls integration (schedule, cost, progress tracking) through BIM enabled processes where applicable. Lead and develop a team of IM, BIM, and digital delivery professionals, building organizational capability and consistency across projects. Drive continuous improvement by incorporating lessons learned and emerging technologies to enhance project delivery and operational readiness. Basic Qualifications: Bachelor's degree in Engineering, Construction Management, Architecture, or related field (or equivalent experience). 10+ years of experience in capital projects, with significant exposure to information management and BIM/digital delivery. Proven experience leading BIM implementation and information management programs on large-scale industrial or infrastructure projects. Strong understanding of project lifecycle phases (engineering, procurement, construction, commissioning, handover). Experience with BIM tools and platforms (e.g., Navisworks, Revit, Bentley, Autodesk Construction Cloud, or similar). Experience with document management systems and common data environments. Demonstrated leadership capability managing cross-functional teams and stakeholders. Desired Qualities: Experience in mining, energy, chemicals, or heavy industrial sectors. Familiarity with asset data integration into ERP/EAM systems (e.g., SAP) and digital twin concepts. Experience with advanced BIM applications (4D scheduling, 5D cost integration, clash detection, model-based construction planning). Knowledge of industry standards (ISO 19650, digital delivery frameworks, etc.). MP Materials is Proud to be an Equal Opportunity / Affirmative Action Employer - EEO is The Law. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability, protected veteran status, or any other characteristic protected by law. Underrepresented groups/Women/Disabled/Veterans are encouraged to apply. Candidates whose disabilities make them unable to meet the position's requirements will still be considered qualified if they can perform the essential functions of the job with reasonable accommodation. Your Right to Work - In compliance with federal law, all persons hired will be required to verify identity and eligibility to work in the United States and to complete the required employment verification document form upon hire. For Assistance with Application - Alternative methods of applying for employment are available to individuals unable to submit an application through this site because of a disability. Contact Human Resources Department at ; 1700 South Pavilion Center Dr. 8th Floor, Las Vegas, NV 89135 to discuss reasonable accommodation.
BMS Estimator (Remote)
Mantis Innovation Lubbock, Texas
Job Description Job Description About Mantis We help organizations improve how their buildings perform by bringing together energy, facility operations, and sustainability into one connected approach. At Mantis, our teams work across the full lifecycle of a facility-from planning and design to field execution and long-term asset management-across commercial and industrial portfolios, data centers, and complex mechanical systems. Our work spans four core areas: Building Controls, Energy Efficiency, Energy Advisory, and Facility Management-covering HVAC/mechanical optimization, BMS/BAS and EPMS controls, lighting system upgrades, energy brokerage, roofing and building envelope assessments, construction management, and more. Whether you're in sales, engineering, construction/project management, field operations, corporate, or technology, you'll play a role in delivering these solutions and helping clients improve facility performance. Position Summary The BMS Estimator is responsible for developing accurate cost estimates and proposals for Building Management Systems (BMS), Building Automation Systems (BAS), HVAC controls, energy management, EPMS integration, and related facility automation projects. The successful candidate combines controls expertise, construction knowledge, operational understanding, and commercial judgment to create competitive and profitable proposals for commercial, industrial, healthcare, pharmaceutical, higher education, and mission-critical data center projects. Key Responsibilities Review construction drawings, specifications, submittals, and bid packages to determine actual BMS/BAS project scope. Responsible for clarifying the SOW by issuing Requests For Information (RFIs) during the bid process Develop equipment counts, point counts, material takeoffs, labor estimates, software requirements, and pricing summaries. Prepare customer-facing proposals, scope documents, exclusions, assumptions, qualifications, and bid summaries. Identify constructability concerns, design conflicts, coordination issues, scope gaps, and commercial risks before contract award. Review revised drawing packages and evaluate impacts to labor, materials, schedule, commissioning requirements, and execution strategy. Solicit, evaluate, and level vendor and subcontractor quotations. Support project handoff activities, change order pricing, and scope evaluations during project execution. Evaluate integration requirements involving BAS, BMS, EPMS, SCADA, DCIM, lighting controls, utility monitoring systems, and third-party integrations. Participate in customer meetings, site walks, pre-bid conferences, and internal estimate reviews. Required Qualifications 5+ years of experience in BMS/BAS, Controls Engineering, Controls Project Management, Controls Field Service, Solutions Engineering, System Integration, or related environments. Ability to read and interpret mechanical, electrical, controls, and construction drawings and specifications. Strong knowledge of HVAC controls, DDC controls, commissioning practices, and operational building systems. Experience developing project scope from construction documents. Strong analytical, organizational, communication, and commercial skills. Preferred Qualifications Experience as a Controls Technician, Controls Engineer, Controls Project Manager, Systems Engineer, Solutions Engineer, or Operations Manager. Experience in mission-critical environments including data centers, healthcare, laboratories, utilities, industrial facilities, central plants, and large commercial facilities. Experience with Niagara, Automated Logic, Schneider Electric EcoStruxure, Siemens Desigo, Johnson Controls Metasys, Honeywell EBI, Distech, or similar platforms. Knowledge of BACnet, Modbus, LonWorks, SNMP, and integrated building systems. Experience commissioning, integrating, programming, troubleshooting, or supporting controls systems. Technical Skills Building Management Systems (BMS) Building Automation Systems (BAS) EPMS, SCADA, and DCIM Systems HVAC and DDC Controls Cost Estimating and Budgeting Bluebeam AutoCAD Revit (Preferred) Microsoft Excel ERP and Project Management Software Typical Deliverables Detailed Cost Estimates Bid Proposals and Quotations Scope of Work Documents Material Takeoffs Labor Forecasts Project Budgets Change Order Pricing Value Engineering Recommendations Working Conditions Work is performed in office, remote, and active project environments with periodic travel based on project and customer needs. Note: Employees are held accountable for all duties of this job. This job description is not intended to be an exhaustive list of all duties, responsibilities, or qualifications associated with the position. What else can we offer you? We offer a fantastic lineup of benefits, including Medical, Dental, Vision, FSA, HSA, 401k Matching, Paid Vacation, Paid Sick, Paid Holidays, Paid Parental Leave, Paid Short Term & Long Term Disability, Tuition Reimbursement, and a flexible hybrid work schedule (for office-based employees). Working at Mantis also brings tremendous professional development opportunities that allow you to make a real impact on both the company and your career! Not sure you meet every single requirement? Studies show that women and individuals from underrepresented groups often hesitate to apply unless they check every box. At Mantis, we're committed to building an inclusive and equitable team-so if this role excites you, we'd love to hear from you, even if your experience doesn't match every single qualification. Mantis Innovation is an equal opportunity employer and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, disability status, protected veteran status, or any other characteristic protected by law. We may use artificial intelligence (AI) tools to support parts of the hiring process, such as reviewing applications, analyzing resumes, or assessing responses and identifying potential inconsistencies or verification signals in application materials based on available information. These tools assist our recruitment team but do not replace human judgment. Final hiring decisions are ultimately made by humans. If you would like more information about how your data is processed, please contact us.
09/20/2026
Full time
Job Description Job Description About Mantis We help organizations improve how their buildings perform by bringing together energy, facility operations, and sustainability into one connected approach. At Mantis, our teams work across the full lifecycle of a facility-from planning and design to field execution and long-term asset management-across commercial and industrial portfolios, data centers, and complex mechanical systems. Our work spans four core areas: Building Controls, Energy Efficiency, Energy Advisory, and Facility Management-covering HVAC/mechanical optimization, BMS/BAS and EPMS controls, lighting system upgrades, energy brokerage, roofing and building envelope assessments, construction management, and more. Whether you're in sales, engineering, construction/project management, field operations, corporate, or technology, you'll play a role in delivering these solutions and helping clients improve facility performance. Position Summary The BMS Estimator is responsible for developing accurate cost estimates and proposals for Building Management Systems (BMS), Building Automation Systems (BAS), HVAC controls, energy management, EPMS integration, and related facility automation projects. The successful candidate combines controls expertise, construction knowledge, operational understanding, and commercial judgment to create competitive and profitable proposals for commercial, industrial, healthcare, pharmaceutical, higher education, and mission-critical data center projects. Key Responsibilities Review construction drawings, specifications, submittals, and bid packages to determine actual BMS/BAS project scope. Responsible for clarifying the SOW by issuing Requests For Information (RFIs) during the bid process Develop equipment counts, point counts, material takeoffs, labor estimates, software requirements, and pricing summaries. Prepare customer-facing proposals, scope documents, exclusions, assumptions, qualifications, and bid summaries. Identify constructability concerns, design conflicts, coordination issues, scope gaps, and commercial risks before contract award. Review revised drawing packages and evaluate impacts to labor, materials, schedule, commissioning requirements, and execution strategy. Solicit, evaluate, and level vendor and subcontractor quotations. Support project handoff activities, change order pricing, and scope evaluations during project execution. Evaluate integration requirements involving BAS, BMS, EPMS, SCADA, DCIM, lighting controls, utility monitoring systems, and third-party integrations. Participate in customer meetings, site walks, pre-bid conferences, and internal estimate reviews. Required Qualifications 5+ years of experience in BMS/BAS, Controls Engineering, Controls Project Management, Controls Field Service, Solutions Engineering, System Integration, or related environments. Ability to read and interpret mechanical, electrical, controls, and construction drawings and specifications. Strong knowledge of HVAC controls, DDC controls, commissioning practices, and operational building systems. Experience developing project scope from construction documents. Strong analytical, organizational, communication, and commercial skills. Preferred Qualifications Experience as a Controls Technician, Controls Engineer, Controls Project Manager, Systems Engineer, Solutions Engineer, or Operations Manager. Experience in mission-critical environments including data centers, healthcare, laboratories, utilities, industrial facilities, central plants, and large commercial facilities. Experience with Niagara, Automated Logic, Schneider Electric EcoStruxure, Siemens Desigo, Johnson Controls Metasys, Honeywell EBI, Distech, or similar platforms. Knowledge of BACnet, Modbus, LonWorks, SNMP, and integrated building systems. Experience commissioning, integrating, programming, troubleshooting, or supporting controls systems. Technical Skills Building Management Systems (BMS) Building Automation Systems (BAS) EPMS, SCADA, and DCIM Systems HVAC and DDC Controls Cost Estimating and Budgeting Bluebeam AutoCAD Revit (Preferred) Microsoft Excel ERP and Project Management Software Typical Deliverables Detailed Cost Estimates Bid Proposals and Quotations Scope of Work Documents Material Takeoffs Labor Forecasts Project Budgets Change Order Pricing Value Engineering Recommendations Working Conditions Work is performed in office, remote, and active project environments with periodic travel based on project and customer needs. Note: Employees are held accountable for all duties of this job. This job description is not intended to be an exhaustive list of all duties, responsibilities, or qualifications associated with the position. What else can we offer you? We offer a fantastic lineup of benefits, including Medical, Dental, Vision, FSA, HSA, 401k Matching, Paid Vacation, Paid Sick, Paid Holidays, Paid Parental Leave, Paid Short Term & Long Term Disability, Tuition Reimbursement, and a flexible hybrid work schedule (for office-based employees). Working at Mantis also brings tremendous professional development opportunities that allow you to make a real impact on both the company and your career! Not sure you meet every single requirement? Studies show that women and individuals from underrepresented groups often hesitate to apply unless they check every box. At Mantis, we're committed to building an inclusive and equitable team-so if this role excites you, we'd love to hear from you, even if your experience doesn't match every single qualification. Mantis Innovation is an equal opportunity employer and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, disability status, protected veteran status, or any other characteristic protected by law. We may use artificial intelligence (AI) tools to support parts of the hiring process, such as reviewing applications, analyzing resumes, or assessing responses and identifying potential inconsistencies or verification signals in application materials based on available information. These tools assist our recruitment team but do not replace human judgment. Final hiring decisions are ultimately made by humans. If you would like more information about how your data is processed, please contact us.
BMS Estimator (Remote)
Mantis Innovation Addison, Texas
Job Description Job Description About Mantis We help organizations improve how their buildings perform by bringing together energy, facility operations, and sustainability into one connected approach. At Mantis, our teams work across the full lifecycle of a facility-from planning and design to field execution and long-term asset management-across commercial and industrial portfolios, data centers, and complex mechanical systems. Our work spans four core areas: Building Controls, Energy Efficiency, Energy Advisory, and Facility Management-covering HVAC/mechanical optimization, BMS/BAS and EPMS controls, lighting system upgrades, energy brokerage, roofing and building envelope assessments, construction management, and more. Whether you're in sales, engineering, construction/project management, field operations, corporate, or technology, you'll play a role in delivering these solutions and helping clients improve facility performance. Position Summary The BMS Estimator is responsible for developing accurate cost estimates and proposals for Building Management Systems (BMS), Building Automation Systems (BAS), HVAC controls, energy management, EPMS integration, and related facility automation projects. The successful candidate combines controls expertise, construction knowledge, operational understanding, and commercial judgment to create competitive and profitable proposals for commercial, industrial, healthcare, pharmaceutical, higher education, and mission-critical data center projects. Key Responsibilities Review construction drawings, specifications, submittals, and bid packages to determine actual BMS/BAS project scope. Responsible for clarifying the SOW by issuing Requests For Information (RFIs) during the bid process Develop equipment counts, point counts, material takeoffs, labor estimates, software requirements, and pricing summaries. Prepare customer-facing proposals, scope documents, exclusions, assumptions, qualifications, and bid summaries. Identify constructability concerns, design conflicts, coordination issues, scope gaps, and commercial risks before contract award. Review revised drawing packages and evaluate impacts to labor, materials, schedule, commissioning requirements, and execution strategy. Solicit, evaluate, and level vendor and subcontractor quotations. Support project handoff activities, change order pricing, and scope evaluations during project execution. Evaluate integration requirements involving BAS, BMS, EPMS, SCADA, DCIM, lighting controls, utility monitoring systems, and third-party integrations. Participate in customer meetings, site walks, pre-bid conferences, and internal estimate reviews. Required Qualifications 5+ years of experience in BMS/BAS, Controls Engineering, Controls Project Management, Controls Field Service, Solutions Engineering, System Integration, or related environments. Ability to read and interpret mechanical, electrical, controls, and construction drawings and specifications. Strong knowledge of HVAC controls, DDC controls, commissioning practices, and operational building systems. Experience developing project scope from construction documents. Strong analytical, organizational, communication, and commercial skills. Preferred Qualifications Experience as a Controls Technician, Controls Engineer, Controls Project Manager, Systems Engineer, Solutions Engineer, or Operations Manager. Experience in mission-critical environments including data centers, healthcare, laboratories, utilities, industrial facilities, central plants, and large commercial facilities. Experience with Niagara, Automated Logic, Schneider Electric EcoStruxure, Siemens Desigo, Johnson Controls Metasys, Honeywell EBI, Distech, or similar platforms. Knowledge of BACnet, Modbus, LonWorks, SNMP, and integrated building systems. Experience commissioning, integrating, programming, troubleshooting, or supporting controls systems. Technical Skills Building Management Systems (BMS) Building Automation Systems (BAS) EPMS, SCADA, and DCIM Systems HVAC and DDC Controls Cost Estimating and Budgeting Bluebeam AutoCAD Revit (Preferred) Microsoft Excel ERP and Project Management Software Typical Deliverables Detailed Cost Estimates Bid Proposals and Quotations Scope of Work Documents Material Takeoffs Labor Forecasts Project Budgets Change Order Pricing Value Engineering Recommendations Working Conditions Work is performed in office, remote, and active project environments with periodic travel based on project and customer needs. Note: Employees are held accountable for all duties of this job. This job description is not intended to be an exhaustive list of all duties, responsibilities, or qualifications associated with the position. What else can we offer you? We offer a fantastic lineup of benefits, including Medical, Dental, Vision, FSA, HSA, 401k Matching, Paid Vacation, Paid Sick, Paid Holidays, Paid Parental Leave, Paid Short Term & Long Term Disability, Tuition Reimbursement, and a flexible hybrid work schedule (for office-based employees). Working at Mantis also brings tremendous professional development opportunities that allow you to make a real impact on both the company and your career! Not sure you meet every single requirement? Studies show that women and individuals from underrepresented groups often hesitate to apply unless they check every box. At Mantis, we're committed to building an inclusive and equitable team-so if this role excites you, we'd love to hear from you, even if your experience doesn't match every single qualification. Mantis Innovation is an equal opportunity employer and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, disability status, protected veteran status, or any other characteristic protected by law. We may use artificial intelligence (AI) tools to support parts of the hiring process, such as reviewing applications, analyzing resumes, or assessing responses and identifying potential inconsistencies or verification signals in application materials based on available information. These tools assist our recruitment team but do not replace human judgment. Final hiring decisions are ultimately made by humans. If you would like more information about how your data is processed, please contact us.
09/20/2026
Full time
Job Description Job Description About Mantis We help organizations improve how their buildings perform by bringing together energy, facility operations, and sustainability into one connected approach. At Mantis, our teams work across the full lifecycle of a facility-from planning and design to field execution and long-term asset management-across commercial and industrial portfolios, data centers, and complex mechanical systems. Our work spans four core areas: Building Controls, Energy Efficiency, Energy Advisory, and Facility Management-covering HVAC/mechanical optimization, BMS/BAS and EPMS controls, lighting system upgrades, energy brokerage, roofing and building envelope assessments, construction management, and more. Whether you're in sales, engineering, construction/project management, field operations, corporate, or technology, you'll play a role in delivering these solutions and helping clients improve facility performance. Position Summary The BMS Estimator is responsible for developing accurate cost estimates and proposals for Building Management Systems (BMS), Building Automation Systems (BAS), HVAC controls, energy management, EPMS integration, and related facility automation projects. The successful candidate combines controls expertise, construction knowledge, operational understanding, and commercial judgment to create competitive and profitable proposals for commercial, industrial, healthcare, pharmaceutical, higher education, and mission-critical data center projects. Key Responsibilities Review construction drawings, specifications, submittals, and bid packages to determine actual BMS/BAS project scope. Responsible for clarifying the SOW by issuing Requests For Information (RFIs) during the bid process Develop equipment counts, point counts, material takeoffs, labor estimates, software requirements, and pricing summaries. Prepare customer-facing proposals, scope documents, exclusions, assumptions, qualifications, and bid summaries. Identify constructability concerns, design conflicts, coordination issues, scope gaps, and commercial risks before contract award. Review revised drawing packages and evaluate impacts to labor, materials, schedule, commissioning requirements, and execution strategy. Solicit, evaluate, and level vendor and subcontractor quotations. Support project handoff activities, change order pricing, and scope evaluations during project execution. Evaluate integration requirements involving BAS, BMS, EPMS, SCADA, DCIM, lighting controls, utility monitoring systems, and third-party integrations. Participate in customer meetings, site walks, pre-bid conferences, and internal estimate reviews. Required Qualifications 5+ years of experience in BMS/BAS, Controls Engineering, Controls Project Management, Controls Field Service, Solutions Engineering, System Integration, or related environments. Ability to read and interpret mechanical, electrical, controls, and construction drawings and specifications. Strong knowledge of HVAC controls, DDC controls, commissioning practices, and operational building systems. Experience developing project scope from construction documents. Strong analytical, organizational, communication, and commercial skills. Preferred Qualifications Experience as a Controls Technician, Controls Engineer, Controls Project Manager, Systems Engineer, Solutions Engineer, or Operations Manager. Experience in mission-critical environments including data centers, healthcare, laboratories, utilities, industrial facilities, central plants, and large commercial facilities. Experience with Niagara, Automated Logic, Schneider Electric EcoStruxure, Siemens Desigo, Johnson Controls Metasys, Honeywell EBI, Distech, or similar platforms. Knowledge of BACnet, Modbus, LonWorks, SNMP, and integrated building systems. Experience commissioning, integrating, programming, troubleshooting, or supporting controls systems. Technical Skills Building Management Systems (BMS) Building Automation Systems (BAS) EPMS, SCADA, and DCIM Systems HVAC and DDC Controls Cost Estimating and Budgeting Bluebeam AutoCAD Revit (Preferred) Microsoft Excel ERP and Project Management Software Typical Deliverables Detailed Cost Estimates Bid Proposals and Quotations Scope of Work Documents Material Takeoffs Labor Forecasts Project Budgets Change Order Pricing Value Engineering Recommendations Working Conditions Work is performed in office, remote, and active project environments with periodic travel based on project and customer needs. Note: Employees are held accountable for all duties of this job. This job description is not intended to be an exhaustive list of all duties, responsibilities, or qualifications associated with the position. What else can we offer you? We offer a fantastic lineup of benefits, including Medical, Dental, Vision, FSA, HSA, 401k Matching, Paid Vacation, Paid Sick, Paid Holidays, Paid Parental Leave, Paid Short Term & Long Term Disability, Tuition Reimbursement, and a flexible hybrid work schedule (for office-based employees). Working at Mantis also brings tremendous professional development opportunities that allow you to make a real impact on both the company and your career! Not sure you meet every single requirement? Studies show that women and individuals from underrepresented groups often hesitate to apply unless they check every box. At Mantis, we're committed to building an inclusive and equitable team-so if this role excites you, we'd love to hear from you, even if your experience doesn't match every single qualification. Mantis Innovation is an equal opportunity employer and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, disability status, protected veteran status, or any other characteristic protected by law. We may use artificial intelligence (AI) tools to support parts of the hiring process, such as reviewing applications, analyzing resumes, or assessing responses and identifying potential inconsistencies or verification signals in application materials based on available information. These tools assist our recruitment team but do not replace human judgment. Final hiring decisions are ultimately made by humans. If you would like more information about how your data is processed, please contact us.
I&C / BMS Construction Manager
OnQGlobalCx Childress, Texas
Job Description Job Description Description: Our team members are consummate professionals who are well respected by our Fortune 100 clients in the semiconductor/cleanroom, manufacturing, and mission-critical data center industries. Our mission is to do the very best for our clients and customers with integrity, professionalism, and altruism allowing them to be the very best in their business globally. Are you ready to be a part of a dynamic team that values excellence, integrity, and collaboration? Our dedicated team believes in honesty, integrity, performance, partnership, and trust, ensuring long-lasting customer and employee relationships built on solid principles. By upholding the highest standards of quality and performance, we aim to achieve total customer satisfaction in the various markets we serve. Role Overview We are seeking an experienced I&C / BMS Construction Manager to oversee the installation, integration, and commissioning of instrumentation & controls (I&C) systems and building management systems (BMS) on a large-scale, mission-critical project. This role will be responsible for managing contractors, ensuring quality and safety standards are met, and driving the successful turnover of critical control systems. Responsibilities Lead on-site supervision of subcontractors installing I&C devices (sensors, transmitters, valves) and BMS infrastructure (controllers, panels, networks). Coordinate interfaces between process utilities, electrical/mechanical systems, and IT/OT networks. Ensure compliance with project specifications, codes, and industry standards. Conduct daily walkdowns, inspections, and progress monitoring for I&C and BMS scopes. Support functional testing, loop checks, and commissioning activities. Manage RFIs, submittals, redlines, and as-built documentation for I&C/BMS systems. Partner with design teams, commissioning agents, and client representatives to resolve technical issues. Track and report progress, risks, and mitigation strategies to project leadership. Promote a safety-first culture with strict adherence to site EHS requirements. Requirements: Qualifications 10+ years of construction management experience with a strong focus on controls, automation, and building systems. Proven background on mission-critical projects such as data centers, semiconductor fabs, or advanced manufacturing facilities. Solid understanding of I&C systems (sensors, transmitters, PLC/DCS integration) and BMS platforms (Johnson Controls, Siemens, Honeywell, Schneider, Tridium Niagara, etc.). Knowledge of communication protocols (BACnet, Modbus, OPC) and networked control systems. Ability to read and interpret P&IDs, one-lines, control schematics, and mechanical/electrical drawings. Strong project management skills with experience overseeing subcontractors, budgets, and schedules. Proficiency with construction/project management tools (Procore, Bluebeam, MS Project, etc.). Preferred Commissioning or QA/QC experience with controls systems. BICSI, PMP, or PE license in Electrical, Mechanical, or Controls Engineering. Vendor certifications in BMS/I&C platforms. Benefits Health Insurance Dental Insurance Vision Insurance 401(k) Holiday Pay Paid Time Off EEO Statement: We are an equal opportunity employer and prohibits discrimination and harassment of any kind. We are dedicated to creating a work environment that is inclusive and welcoming to all employees. All qualified applicants will receive consideration for employment without regard to race, color, religion, gender, gender identity or expression, sexual orientation, national origin, genetics, disability, age, or veteran status. Notice to all Employment, Staffing & Recruiting Agencies and Recruiters: We please ask that you do not directly email, call or visit our hiring managers. OnQ does not accept unsolicited resumes and should any be received from a third party they will not be considered, unless a signed agreement is in place. If you would like to discuss becoming a preferred staffing vendor to OnQ please contact our talent acquisition team who will advise you on the process.
09/20/2026
Full time
Job Description Job Description Description: Our team members are consummate professionals who are well respected by our Fortune 100 clients in the semiconductor/cleanroom, manufacturing, and mission-critical data center industries. Our mission is to do the very best for our clients and customers with integrity, professionalism, and altruism allowing them to be the very best in their business globally. Are you ready to be a part of a dynamic team that values excellence, integrity, and collaboration? Our dedicated team believes in honesty, integrity, performance, partnership, and trust, ensuring long-lasting customer and employee relationships built on solid principles. By upholding the highest standards of quality and performance, we aim to achieve total customer satisfaction in the various markets we serve. Role Overview We are seeking an experienced I&C / BMS Construction Manager to oversee the installation, integration, and commissioning of instrumentation & controls (I&C) systems and building management systems (BMS) on a large-scale, mission-critical project. This role will be responsible for managing contractors, ensuring quality and safety standards are met, and driving the successful turnover of critical control systems. Responsibilities Lead on-site supervision of subcontractors installing I&C devices (sensors, transmitters, valves) and BMS infrastructure (controllers, panels, networks). Coordinate interfaces between process utilities, electrical/mechanical systems, and IT/OT networks. Ensure compliance with project specifications, codes, and industry standards. Conduct daily walkdowns, inspections, and progress monitoring for I&C and BMS scopes. Support functional testing, loop checks, and commissioning activities. Manage RFIs, submittals, redlines, and as-built documentation for I&C/BMS systems. Partner with design teams, commissioning agents, and client representatives to resolve technical issues. Track and report progress, risks, and mitigation strategies to project leadership. Promote a safety-first culture with strict adherence to site EHS requirements. Requirements: Qualifications 10+ years of construction management experience with a strong focus on controls, automation, and building systems. Proven background on mission-critical projects such as data centers, semiconductor fabs, or advanced manufacturing facilities. Solid understanding of I&C systems (sensors, transmitters, PLC/DCS integration) and BMS platforms (Johnson Controls, Siemens, Honeywell, Schneider, Tridium Niagara, etc.). Knowledge of communication protocols (BACnet, Modbus, OPC) and networked control systems. Ability to read and interpret P&IDs, one-lines, control schematics, and mechanical/electrical drawings. Strong project management skills with experience overseeing subcontractors, budgets, and schedules. Proficiency with construction/project management tools (Procore, Bluebeam, MS Project, etc.). Preferred Commissioning or QA/QC experience with controls systems. BICSI, PMP, or PE license in Electrical, Mechanical, or Controls Engineering. Vendor certifications in BMS/I&C platforms. Benefits Health Insurance Dental Insurance Vision Insurance 401(k) Holiday Pay Paid Time Off EEO Statement: We are an equal opportunity employer and prohibits discrimination and harassment of any kind. We are dedicated to creating a work environment that is inclusive and welcoming to all employees. All qualified applicants will receive consideration for employment without regard to race, color, religion, gender, gender identity or expression, sexual orientation, national origin, genetics, disability, age, or veteran status. Notice to all Employment, Staffing & Recruiting Agencies and Recruiters: We please ask that you do not directly email, call or visit our hiring managers. OnQ does not accept unsolicited resumes and should any be received from a third party they will not be considered, unless a signed agreement is in place. If you would like to discuss becoming a preferred staffing vendor to OnQ please contact our talent acquisition team who will advise you on the process.
BMS Estimator (Remote)
Mantis Innovation Waco, Texas
Job Description Job Description About Mantis We help organizations improve how their buildings perform by bringing together energy, facility operations, and sustainability into one connected approach. At Mantis, our teams work across the full lifecycle of a facility-from planning and design to field execution and long-term asset management-across commercial and industrial portfolios, data centers, and complex mechanical systems. Our work spans four core areas: Building Controls, Energy Efficiency, Energy Advisory, and Facility Management-covering HVAC/mechanical optimization, BMS/BAS and EPMS controls, lighting system upgrades, energy brokerage, roofing and building envelope assessments, construction management, and more. Whether you're in sales, engineering, construction/project management, field operations, corporate, or technology, you'll play a role in delivering these solutions and helping clients improve facility performance. Position Summary The BMS Estimator is responsible for developing accurate cost estimates and proposals for Building Management Systems (BMS), Building Automation Systems (BAS), HVAC controls, energy management, EPMS integration, and related facility automation projects. The successful candidate combines controls expertise, construction knowledge, operational understanding, and commercial judgment to create competitive and profitable proposals for commercial, industrial, healthcare, pharmaceutical, higher education, and mission-critical data center projects. Key Responsibilities Review construction drawings, specifications, submittals, and bid packages to determine actual BMS/BAS project scope. Responsible for clarifying the SOW by issuing Requests For Information (RFIs) during the bid process Develop equipment counts, point counts, material takeoffs, labor estimates, software requirements, and pricing summaries. Prepare customer-facing proposals, scope documents, exclusions, assumptions, qualifications, and bid summaries. Identify constructability concerns, design conflicts, coordination issues, scope gaps, and commercial risks before contract award. Review revised drawing packages and evaluate impacts to labor, materials, schedule, commissioning requirements, and execution strategy. Solicit, evaluate, and level vendor and subcontractor quotations. Support project handoff activities, change order pricing, and scope evaluations during project execution. Evaluate integration requirements involving BAS, BMS, EPMS, SCADA, DCIM, lighting controls, utility monitoring systems, and third-party integrations. Participate in customer meetings, site walks, pre-bid conferences, and internal estimate reviews. Required Qualifications 5+ years of experience in BMS/BAS, Controls Engineering, Controls Project Management, Controls Field Service, Solutions Engineering, System Integration, or related environments. Ability to read and interpret mechanical, electrical, controls, and construction drawings and specifications. Strong knowledge of HVAC controls, DDC controls, commissioning practices, and operational building systems. Experience developing project scope from construction documents. Strong analytical, organizational, communication, and commercial skills. Preferred Qualifications Experience as a Controls Technician, Controls Engineer, Controls Project Manager, Systems Engineer, Solutions Engineer, or Operations Manager. Experience in mission-critical environments including data centers, healthcare, laboratories, utilities, industrial facilities, central plants, and large commercial facilities. Experience with Niagara, Automated Logic, Schneider Electric EcoStruxure, Siemens Desigo, Johnson Controls Metasys, Honeywell EBI, Distech, or similar platforms. Knowledge of BACnet, Modbus, LonWorks, SNMP, and integrated building systems. Experience commissioning, integrating, programming, troubleshooting, or supporting controls systems. Technical Skills Building Management Systems (BMS) Building Automation Systems (BAS) EPMS, SCADA, and DCIM Systems HVAC and DDC Controls Cost Estimating and Budgeting Bluebeam AutoCAD Revit (Preferred) Microsoft Excel ERP and Project Management Software Typical Deliverables Detailed Cost Estimates Bid Proposals and Quotations Scope of Work Documents Material Takeoffs Labor Forecasts Project Budgets Change Order Pricing Value Engineering Recommendations Working Conditions Work is performed in office, remote, and active project environments with periodic travel based on project and customer needs. Note: Employees are held accountable for all duties of this job. This job description is not intended to be an exhaustive list of all duties, responsibilities, or qualifications associated with the position. What else can we offer you? We offer a fantastic lineup of benefits, including Medical, Dental, Vision, FSA, HSA, 401k Matching, Paid Vacation, Paid Sick, Paid Holidays, Paid Parental Leave, Paid Short Term & Long Term Disability, Tuition Reimbursement, and a flexible hybrid work schedule (for office-based employees). Working at Mantis also brings tremendous professional development opportunities that allow you to make a real impact on both the company and your career! Not sure you meet every single requirement? Studies show that women and individuals from underrepresented groups often hesitate to apply unless they check every box. At Mantis, we're committed to building an inclusive and equitable team-so if this role excites you, we'd love to hear from you, even if your experience doesn't match every single qualification. Mantis Innovation is an equal opportunity employer and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, disability status, protected veteran status, or any other characteristic protected by law. We may use artificial intelligence (AI) tools to support parts of the hiring process, such as reviewing applications, analyzing resumes, or assessing responses and identifying potential inconsistencies or verification signals in application materials based on available information. These tools assist our recruitment team but do not replace human judgment. Final hiring decisions are ultimately made by humans. If you would like more information about how your data is processed, please contact us.
09/20/2026
Full time
Job Description Job Description About Mantis We help organizations improve how their buildings perform by bringing together energy, facility operations, and sustainability into one connected approach. At Mantis, our teams work across the full lifecycle of a facility-from planning and design to field execution and long-term asset management-across commercial and industrial portfolios, data centers, and complex mechanical systems. Our work spans four core areas: Building Controls, Energy Efficiency, Energy Advisory, and Facility Management-covering HVAC/mechanical optimization, BMS/BAS and EPMS controls, lighting system upgrades, energy brokerage, roofing and building envelope assessments, construction management, and more. Whether you're in sales, engineering, construction/project management, field operations, corporate, or technology, you'll play a role in delivering these solutions and helping clients improve facility performance. Position Summary The BMS Estimator is responsible for developing accurate cost estimates and proposals for Building Management Systems (BMS), Building Automation Systems (BAS), HVAC controls, energy management, EPMS integration, and related facility automation projects. The successful candidate combines controls expertise, construction knowledge, operational understanding, and commercial judgment to create competitive and profitable proposals for commercial, industrial, healthcare, pharmaceutical, higher education, and mission-critical data center projects. Key Responsibilities Review construction drawings, specifications, submittals, and bid packages to determine actual BMS/BAS project scope. Responsible for clarifying the SOW by issuing Requests For Information (RFIs) during the bid process Develop equipment counts, point counts, material takeoffs, labor estimates, software requirements, and pricing summaries. Prepare customer-facing proposals, scope documents, exclusions, assumptions, qualifications, and bid summaries. Identify constructability concerns, design conflicts, coordination issues, scope gaps, and commercial risks before contract award. Review revised drawing packages and evaluate impacts to labor, materials, schedule, commissioning requirements, and execution strategy. Solicit, evaluate, and level vendor and subcontractor quotations. Support project handoff activities, change order pricing, and scope evaluations during project execution. Evaluate integration requirements involving BAS, BMS, EPMS, SCADA, DCIM, lighting controls, utility monitoring systems, and third-party integrations. Participate in customer meetings, site walks, pre-bid conferences, and internal estimate reviews. Required Qualifications 5+ years of experience in BMS/BAS, Controls Engineering, Controls Project Management, Controls Field Service, Solutions Engineering, System Integration, or related environments. Ability to read and interpret mechanical, electrical, controls, and construction drawings and specifications. Strong knowledge of HVAC controls, DDC controls, commissioning practices, and operational building systems. Experience developing project scope from construction documents. Strong analytical, organizational, communication, and commercial skills. Preferred Qualifications Experience as a Controls Technician, Controls Engineer, Controls Project Manager, Systems Engineer, Solutions Engineer, or Operations Manager. Experience in mission-critical environments including data centers, healthcare, laboratories, utilities, industrial facilities, central plants, and large commercial facilities. Experience with Niagara, Automated Logic, Schneider Electric EcoStruxure, Siemens Desigo, Johnson Controls Metasys, Honeywell EBI, Distech, or similar platforms. Knowledge of BACnet, Modbus, LonWorks, SNMP, and integrated building systems. Experience commissioning, integrating, programming, troubleshooting, or supporting controls systems. Technical Skills Building Management Systems (BMS) Building Automation Systems (BAS) EPMS, SCADA, and DCIM Systems HVAC and DDC Controls Cost Estimating and Budgeting Bluebeam AutoCAD Revit (Preferred) Microsoft Excel ERP and Project Management Software Typical Deliverables Detailed Cost Estimates Bid Proposals and Quotations Scope of Work Documents Material Takeoffs Labor Forecasts Project Budgets Change Order Pricing Value Engineering Recommendations Working Conditions Work is performed in office, remote, and active project environments with periodic travel based on project and customer needs. Note: Employees are held accountable for all duties of this job. This job description is not intended to be an exhaustive list of all duties, responsibilities, or qualifications associated with the position. What else can we offer you? We offer a fantastic lineup of benefits, including Medical, Dental, Vision, FSA, HSA, 401k Matching, Paid Vacation, Paid Sick, Paid Holidays, Paid Parental Leave, Paid Short Term & Long Term Disability, Tuition Reimbursement, and a flexible hybrid work schedule (for office-based employees). Working at Mantis also brings tremendous professional development opportunities that allow you to make a real impact on both the company and your career! Not sure you meet every single requirement? Studies show that women and individuals from underrepresented groups often hesitate to apply unless they check every box. At Mantis, we're committed to building an inclusive and equitable team-so if this role excites you, we'd love to hear from you, even if your experience doesn't match every single qualification. Mantis Innovation is an equal opportunity employer and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, disability status, protected veteran status, or any other characteristic protected by law. We may use artificial intelligence (AI) tools to support parts of the hiring process, such as reviewing applications, analyzing resumes, or assessing responses and identifying potential inconsistencies or verification signals in application materials based on available information. These tools assist our recruitment team but do not replace human judgment. Final hiring decisions are ultimately made by humans. If you would like more information about how your data is processed, please contact us.
Amazon Data Services, Inc.
Data Center Project Manager, Critical Projects Implementation
Amazon Data Services, Inc. Manassas, Virginia
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we're the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain - and we're looking for talented people who want to help. You'll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You'll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you'll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion. The Critical Projects Implementation (CPI) team is a project management and execution team that manages construction activity within the operational data center spaces. The CPI team is tasked with critical infrastructure improvement projects to optimize utilization of space, power, and cooling within operational data centers around the globe. These activities are outside of the scope of standard construction delivery and regular preventative maintenance tasks. We are currently seeking a Data Center Project Manager to serve as a technical resource within Amazon data centers. You will be part of a highly creative, efficient team tasked with tackling the most fascinating and challenges in designing, building, and operating Amazon data center facilities. The Project Manager is ultimately responsible for project oversight and review of all disciplines including electrical, mechanical, controls, and architectural. A fundamental understanding of these systems is required, as the individual will be expected to identify areas for improvement as well as act on data provided from other team and organizations. Ideal candidates will possess the ability to design, develop and deploy innovative solutions to address operational challenges. This role requires both independent contribution as well as the ability to work within multi-disciplinary teams. The scope of projects will include but not limited to the improvement of electrical, mechanical, fire detection and building automation system. The Project Manager is responsible for the overall direction, coordination, implementation, execution, control and completion of specific projects ensuring consistency with company strategy, commitments and goals. About the team Why AWS Amazon Web Services (AWS) is the world's most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating - that's why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses. Diverse Experiences Amazon values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn't followed a traditional path, or includes alternative experiences, don't let it stop you from applying. Work/Life Balance We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there's nothing we can't achieve in the cloud. Inclusive Team Culture Here at AWS, it's in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon (diversity) conferences, inspire us to never stop embracing our uniqueness. Mentorship and Career Growth We're continuously raising our performance bar as we strive to become Earth's Best Employer. That's why you'll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional. BASIC QUALIFICATIONS - 5+ years of construction or project management experience - 5+ years experience managing projects in data centers or comparable critical infrastructure in an operational space. Comparable critical infrastructure experience is defined as a facility that includes a 24/7 emergency backup system, manufacturing facility (semiconductor, auto, medical equipment or Clean rooms), Mass Transportation (freight or passenger rail), Oil and Gas, Utility, Hospitals or similar industry. - 5+ years in on-site construction trades (mechanical, electrical, general) Vendor Management. PREFERRED QUALIFICATIONS - Bachelor's degree in engineering, project management, construction management or similar technical focus - 5+ years of electrical or mechanical, or 5+ years of data center engineering experience - Can work proactively and independently, meet deadlines, and deliver on projects and tasks - Demonstrated ability to understand and discuss technical concepts, manage trade-offs, incorporate feedback, and evaluate opportunistic new ideas with a variety of internal and external stakeholders Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status. Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit for more information. If the country/region you're applying in isn't listed, please contact your Recruiting Partner. The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at . USA, VA, Manassas - 111 100.00 USD annually
09/20/2026
Full time
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we're the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain - and we're looking for talented people who want to help. You'll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You'll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you'll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion. The Critical Projects Implementation (CPI) team is a project management and execution team that manages construction activity within the operational data center spaces. The CPI team is tasked with critical infrastructure improvement projects to optimize utilization of space, power, and cooling within operational data centers around the globe. These activities are outside of the scope of standard construction delivery and regular preventative maintenance tasks. We are currently seeking a Data Center Project Manager to serve as a technical resource within Amazon data centers. You will be part of a highly creative, efficient team tasked with tackling the most fascinating and challenges in designing, building, and operating Amazon data center facilities. The Project Manager is ultimately responsible for project oversight and review of all disciplines including electrical, mechanical, controls, and architectural. A fundamental understanding of these systems is required, as the individual will be expected to identify areas for improvement as well as act on data provided from other team and organizations. Ideal candidates will possess the ability to design, develop and deploy innovative solutions to address operational challenges. This role requires both independent contribution as well as the ability to work within multi-disciplinary teams. The scope of projects will include but not limited to the improvement of electrical, mechanical, fire detection and building automation system. The Project Manager is responsible for the overall direction, coordination, implementation, execution, control and completion of specific projects ensuring consistency with company strategy, commitments and goals. About the team Why AWS Amazon Web Services (AWS) is the world's most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating - that's why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses. Diverse Experiences Amazon values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn't followed a traditional path, or includes alternative experiences, don't let it stop you from applying. Work/Life Balance We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there's nothing we can't achieve in the cloud. Inclusive Team Culture Here at AWS, it's in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon (diversity) conferences, inspire us to never stop embracing our uniqueness. Mentorship and Career Growth We're continuously raising our performance bar as we strive to become Earth's Best Employer. That's why you'll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional. BASIC QUALIFICATIONS - 5+ years of construction or project management experience - 5+ years experience managing projects in data centers or comparable critical infrastructure in an operational space. Comparable critical infrastructure experience is defined as a facility that includes a 24/7 emergency backup system, manufacturing facility (semiconductor, auto, medical equipment or Clean rooms), Mass Transportation (freight or passenger rail), Oil and Gas, Utility, Hospitals or similar industry. - 5+ years in on-site construction trades (mechanical, electrical, general) Vendor Management. PREFERRED QUALIFICATIONS - Bachelor's degree in engineering, project management, construction management or similar technical focus - 5+ years of electrical or mechanical, or 5+ years of data center engineering experience - Can work proactively and independently, meet deadlines, and deliver on projects and tasks - Demonstrated ability to understand and discuss technical concepts, manage trade-offs, incorporate feedback, and evaluate opportunistic new ideas with a variety of internal and external stakeholders Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status. Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit for more information. If the country/region you're applying in isn't listed, please contact your Recruiting Partner. The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at . USA, VA, Manassas - 111 100.00 USD annually
Amazon Data Services, Inc.
Sr. Schedule Controls Manager, AMER Construction Programs
Amazon Data Services, Inc. Herndon, Virginia
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we're the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain - and we're looking for talented people who want to help. You'll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You'll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you'll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion. The AMER Schedule Controls Manager is responsible for managing some of the most technical, cost-efficient, and fast-paced construction project schedules achievable. They are constantly challenged to drive continuous improvement, reduced timelines & identify spend reduction opportunities while delivering the highest quality, most technically efficient data centers in the world. Key job responsibilities Lead strategic schedule management for Amazon's innovative data center construction projects across the Americas. As a key member of our team, you'll provide expert guidance on complex project scheduling challenges while ensuring timely delivery of critical infrastructure. Key Responsibilities: • Lead and mentor a team of contract Schedulers Develop and analyze project schedules (L1-L5), identifying critical paths and optimization opportunities Facilitate Interactive Project Planning Meetings (IPPM) with internal/external stakeholders Conduct schedule risk assessments and what-if scenarios Review and validate contractor schedules and resource loading Prepare executive-level schedule status reports and dashboards Oversee Earned Value Management (EVM) implementation for schedule tracking Support schedule forensic analysis and improvement initiatives Technical Requirements: Expert knowledge of project scheduling methodologies and tools Ability to interpret multi-discipline construction documents Understanding of building codes (Life Safety, BOCA, NFPA, NEC, OSHA) Experience with progress measurement and performance tracking Travel Requirements: • Up to 25% travel across Americas (US, Canada, LATAM) • Site visits for pre-construction planning, systems reviews, and commissioning support About the team Why AWS Amazon Web Services (AWS) is the world's most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating - that's why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses. Diverse Experiences Amazon values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn't followed a traditional path, or includes alternative experiences, don't let it stop you from applying. Work/Life Balance We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there's nothing we can't achieve in the cloud. Inclusive Team Culture Here at AWS, it's in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon (gender diversity) conferences, inspire us to never stop embracing our uniqueness. Mentorship and Career Growth We're continuously raising our performance bar as we strive to become Earth's Best Employer. That's why you'll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional. BASIC QUALIFICATIONS - Bachelor's degree in Mechanical Engineering PREFERRED QUALIFICATIONS - Expert-level Primavera P6 skills all schedule management tooling and techniques Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status. Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit for more information. If the country/region you're applying in isn't listed, please contact your Recruiting Partner. The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at . USA, VA, Herndon - 139 000.00 USD annually
09/20/2026
Full time
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we're the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain - and we're looking for talented people who want to help. You'll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You'll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you'll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion. The AMER Schedule Controls Manager is responsible for managing some of the most technical, cost-efficient, and fast-paced construction project schedules achievable. They are constantly challenged to drive continuous improvement, reduced timelines & identify spend reduction opportunities while delivering the highest quality, most technically efficient data centers in the world. Key job responsibilities Lead strategic schedule management for Amazon's innovative data center construction projects across the Americas. As a key member of our team, you'll provide expert guidance on complex project scheduling challenges while ensuring timely delivery of critical infrastructure. Key Responsibilities: • Lead and mentor a team of contract Schedulers Develop and analyze project schedules (L1-L5), identifying critical paths and optimization opportunities Facilitate Interactive Project Planning Meetings (IPPM) with internal/external stakeholders Conduct schedule risk assessments and what-if scenarios Review and validate contractor schedules and resource loading Prepare executive-level schedule status reports and dashboards Oversee Earned Value Management (EVM) implementation for schedule tracking Support schedule forensic analysis and improvement initiatives Technical Requirements: Expert knowledge of project scheduling methodologies and tools Ability to interpret multi-discipline construction documents Understanding of building codes (Life Safety, BOCA, NFPA, NEC, OSHA) Experience with progress measurement and performance tracking Travel Requirements: • Up to 25% travel across Americas (US, Canada, LATAM) • Site visits for pre-construction planning, systems reviews, and commissioning support About the team Why AWS Amazon Web Services (AWS) is the world's most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating - that's why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses. Diverse Experiences Amazon values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn't followed a traditional path, or includes alternative experiences, don't let it stop you from applying. Work/Life Balance We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there's nothing we can't achieve in the cloud. Inclusive Team Culture Here at AWS, it's in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon (gender diversity) conferences, inspire us to never stop embracing our uniqueness. Mentorship and Career Growth We're continuously raising our performance bar as we strive to become Earth's Best Employer. That's why you'll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional. BASIC QUALIFICATIONS - Bachelor's degree in Mechanical Engineering PREFERRED QUALIFICATIONS - Expert-level Primavera P6 skills all schedule management tooling and techniques Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status. Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit for more information. If the country/region you're applying in isn't listed, please contact your Recruiting Partner. The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at . USA, VA, Herndon - 139 000.00 USD annually

Modal Window

  • Blog
  • Contact
  • About Us
  • Terms & Conditions
  • Privacy
  • Employer
  • Post a Job
  • Search Resumes
  • Sign in
  • Job Seeker
  • Find Jobs
  • Create Resume
  • Sign in
  • Facebook
  • Twitter
  • Instagram
  • Pinterest
  • Youtube
Parent and Partner sites: IT Job Board | Search Jobs Near Me | RightTalent.co.uk | Quantity Surveyor jobs | Building Surveyor jobs | Construction Recruitment | Talent Recruiter | London Jobs | Property jobs
© 2008-2026 My Jobs Near Me